Change Rule of Blasting Vibration Peak Velocity in Brick-Concrete Building
Abstract:
In this paper, the background is Qingdao Cross-harbor Tunnel Guide Line Project. The research on blasting vibration peak velocity was carried out by monitoring a 6-layer brick-concrete building. According the research, we discover that vibration peak velocity in the vertical direction reaches a maximum on the roof of the building. In the horizontal radial and tangential horizontal direction, the maximum appears at the 1st or 2nd floor. Third, within certain distance from blasting center, the value of horizontal vibration peak velocity is larger than vertical vibration peak velocity.