Road Construction Project Environmental Impact Assessment Scope Definition Using Project Definition Rating Index (PDRI)

Article Preview

Abstract:

This research focuses on the study of Environment Impact Assessment (EIA) for the new engineering development project of Suao-Hualian Section along the Eastern Freeway. The Project Definition Rating Index (PDRI) Mode is the quantitative assessment method developed by Americas Construction Industry Institute (CII), which is the EIA operation by incorporating PDRI in the road construction. The EIA-PDRI mode is mainly established according to the EIA related laws currently practiced in Taiwan and relevant expert questionnaires. Under such configuration, the Vector Weighing Method is based for setting up the weight between the Section, Category and Element. The verification result of this Research supports that the EIA-PDRI Assessment Mode can help set the preliminary scope of the project development while enhancing the EIA performance.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

885-892

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Dr. G Edward Gibson Jr and Roberta Bosfield., Common Barriers to Effective Front-End Planning of Capital Projects, Construction Research Congress Report, Austin, 2012, pp.2459-2467.

DOI: 10.1061/9780784412329.247

Google Scholar

[2] Dumont, P. R. and Gibson, G. E., Project Definition Rating Index (PDRI), A report to the Construction Industry Institute, Austin, 1996, pp.113-11.

Google Scholar

[3] Cho, C., Furman, J. C., and Gibson, G. E. Jr., Development of the Project Definition Rating Index (PDRI) for Building Projects, A report to the Construction Industry Institute RR 155-11, Austin, 1999, p.296.

DOI: 10.1061/40475(278)38

Google Scholar

[4] Construction Industry Institute (2008a), Pre-Project Planning Tool: PDRI for Buildings, Construction Industry Institute, 3rd Edition, Austin, 2008.

Google Scholar

[5] Yu-Ren Wang, G. Edward Gibson Jr., A study of pre-project planning and project success using ANNs and regression models, Automation in Construction, Sci. 19(2010) 341–346.

DOI: 10.1016/j.autcon.2009.12.007

Google Scholar

[6] Construction Industry Institute, PDRI: Project Definition Rating Index Infrastructure Projects, Implementation Resource, Construction Industry Institute, Austin, 2010, pp.268-2.

Google Scholar

[7] Evan Bingham, Development of the Project Definition Rating Index (PDRI) For Infrastructure Projects, Master's thesis for Science Degree, Arizona State University, Arizona State USA, 2010.

Google Scholar

[8] Yu-Ren Wang, Yi-Jao Chen and C.F. Jeffrey Huang, Applying Neural Network Ensemble Concepts for Modeling Project Success, 26th International Symposium on Automation and Robotics in Construction, Management and Social Issues199-205, (2009)

DOI: 10.22260/isarc2009/0015

Google Scholar

[9] US Army Corps of Engineers, Engineering and Construction Bulletin, No. 2009-25, USA, 2009.

Google Scholar

[10] Palmer, Jim, G. Edward Gibson, Jr., Bingham, Evan, Front End Planning of Railway Projects, American Public Transportation Association, Canada, 2010.

Google Scholar

[11] Construction Industry Institute (2008b), PDRI: Project Definition Rating Index Industrial Projects, Construction Industry Institute, Research Summary 113-2, 3rd Edition, Austin, TX, 2008.

Google Scholar

[12] Construction Industry Institute (CII), Project definition rating index (PDRI), building projects. Implementation Resource, Austin, 1999, pp.155-2.

Google Scholar

[13] Cho, C. S., Development of the project definition rating index (PDRI) for building projects, PhD thesis, Dept. of Civ. Energy., University of Texas at Austin, 2000.

DOI: 10.1061/40475(278)38

Google Scholar

[14] Chung-Suk Cho and G. Edward Gibson Jr., Members, Building Project Scope Definition Using Project Definition Rating Index, Journal of architectural engineering, 2001, pp.115-125.

DOI: 10.1061/(asce)1076-0431(2001)7:4(115)

Google Scholar

[15] Yu-Ren Wang, G. Edward Gibson, Jr., Pre-Project Planning and Its Practice In Industry, ISARC 2006, pp.878-883.

Google Scholar

[16] Produced under the guidance of the NASA Pre-Project Planning Team, Project Definition Rating Index Use on NASA Facilities, USA, 2000.

Google Scholar

[17] Study on Environment Impact Assessment System Issues Research, Development and Evaluation Commission, Taipei, 2010.

Google Scholar

[18] T. Saaty, J.S. Shang, Group decision-making: head-count versus intensity of preference, Socio-Economic Planning Sciences 41, 2007, p.22–37.

DOI: 10.1016/j.seps.2005.10.001

Google Scholar

[19] S. Jharkharia, R. Shankar, Selection of logistics service provider: an analytic network process (ANP) approach, Omega 35 (3), 2007, p.274–289.

DOI: 10.1016/j.omega.2005.06.005

Google Scholar

[20] TANEEB, M.O.T.C., Report on Environment Impact for Kaohsiung Section Project, Freeway #7, Taipei, 2010.

Google Scholar

[21] TANEEB, M.O.T.C., EIA Report on the Feasibility of Alternative for the Widening Project between Wugu Section to Yangmei Section, Freeway #1, Taipei, 2008.

Google Scholar