Research on Evaluation about Measures with Water Plugging in the West of Bei 3 Area of Daqing Saertu Oilfield

Article Preview

Abstract:

Measure of plugging water refers to through sealing high water formation to slow down the contradiction between lays, so as to increase the liquid production of low water formation and to increase the swept volume the extent of reserves producing. It is an important measure that aims at the rapid increasing of liquid-oil ratio in late stage of high water-cut, to keep the stable production of oil field. It is an effective measure to reduce and control the useless water production rate which not only can increase the fluid production sensibly but also can slow down the production decline and guarantee the economic rationality in oilfield development. Field practice has proved that the measure of plugging water has a better guiding significance to the reservoir in late high or extra high water-cut stage. Through analyzing the effect of plugging water, and a comprehensive evaluation of the effect of plugging water, we can find out the key factors that affect the measures of plugging water, which has a better guiding significance to maximize the high water cut oilfield development profit.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 726-731)

Pages:

3084-3088

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zhou Xuemin, Liu Ruiqi, Zhang Tongyu, the research of water shutoff the principle boundaries in late high water cut wells [J].Daqing Petroleum Exploration and Development, 1994,3 (15) :31-35.(in Chinese)

Google Scholar

[2] Feng Qihong, Han Song, Zhao Wenyong, the prediction the wells water shutoff effect with application of artificial neural network [J]. Daqing Petroleum Exploration and Development, 2001,8 (20) :42-44.(in Chinese)

Google Scholar

[3] Niu Shizhong, the research of Saertu reservoir remaining oil technology [J]. Jianghan Petroleum Institute, 2004,6 (26) :77-79.(in Chinese)

Google Scholar

[4] Li Qi, Zhou Yuezhong, Gao Ping, the research of water shutoff boundaries in Zhongyuan Oilfield in high water cut wells [J] Fault Block Oil and Gas Fields, 2001,3 (2) :10-13.(in Chinese)

Google Scholar