Comparing and Selecting the Dewatering Schemes of Tibet Linzhi Duobu Hydropower Station Underground Factory Buildings
Abstract:
This article which based on the analysis of the Tibet Linzhi Duobu hydropower stations geological conditions, the review of the permeability coefficient, total water inflow estimation of foundation pit and other foundation researches compares and selects water-lowering schemes when the excavation of underground factory buildings starts. Comparing the impervious curtain and water-lowering scheme with full-well dewatering scheme on applicable conditions, advantages and disadvantages, construction program and cost accounting etc. in detail and the final selection is the "drain openly + the well dewatering program. This article also makes a very detailed discussion on construction management, operation mode, safeguard measures and contingency measures and hopes to have references to the follow-up projects.
Info:
Periodical:
Pages:
3237-3243
Citation:
Online since:
August 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: