Research on Various Operation Modes of Geheyan Hydropower Station Reservoir in the Qingjiang River

Article Preview

Abstract:

According to the characteristics and main task of the Geheyan hydropower station reservoir in the Qingjiang River, the problem of how to use reservoir storage capacity to cope with the contradictions between the flood control and power generation, reliability and economy of hydropower station, the supply and demand of power when runoff cannot be accurately forecasted. Aiming at these problems, various operation modes of Geheyan hydropower station are presented in this paper. In order to pursue maximizing generation benefit, considering both hydro condition and adjust peak requirement of power system, the expected benefit as the objective function is presented. Comparisons are conducted for three various operation modes. The results show that dynamic programming successive approximations (DPSA) is better than other algorithms, whose average annual generation and generating guarantee rate increase obviously compared to the effects of other algorithms.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 726-731)

Pages:

3486-3491

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Teegavarapu, R. S. & Simonovic, S. P. Short-term operation model for coupled hydropower reservoirs. Journal of Water Resources Planning and Management, 2000, 126: 98-106.

DOI: 10.1061/(asce)0733-9496(2000)126:2(98)

Google Scholar

[2] Labadie, J. W. Optimal operation of multireservoir systems: State-of-the-art review. Journal of Water Resources Planning and Management, 2004, 130: 93-111.

DOI: 10.1061/(asce)0733-9496(2004)130:2(93)

Google Scholar

[3] Tospornsampan, J., Kita, I., Ishii, M. & Kitamura, Y. Optimization of a multiple reservoir system operation using a combination of genetic algorithm and discrete differential dynamic programming: a case study in Mae Klong system, Thailand. Paddy and Water Environment, 2005, 3: 29-38.

DOI: 10.1007/s10333-005-0070-y

Google Scholar

[4] Larson, R. & Korsak, A. A dynamic programming successive approximations technique with convergence proofs. Automatica, 1970, 6: 245-252.

DOI: 10.1016/0005-1098(70)90095-6

Google Scholar

[5] Yeh, W. W. Reservoir management and operations models: A state-of-the-art review. Water Resources Research, 1985, 21: 1797-1818.

DOI: 10.1029/wr021i012p01797

Google Scholar