Comprehensive Fuzzy Evaluation for Transmission Network Planning Scheme Based on Gray Correlation Analysis

Article Preview

Abstract:

The comprehensive fuzzy evaluation method for transmission network planning scheme has the drawback that relying more on the subjectivity. To solve this problem, gray theory is introduced into comprehensive fuzzy evaluation method. Gray correlation analysis method is used to calculate gray correlation coefficient as the membership of evaluation index to get fuzzy evaluation matrix. Then, the fuzzy weight vector is determined by the subjective and objective empowerment by integrating AHP and entropy method. Comprehensive fuzzy evaluation vector is obtained by using composite operator to synthesis evaluation matrix and fuzzy weight vector. The obtained result is used to evaluate transmission network planning scheme. Therefore, the problem that judger definate membership function based on subjective view is solved by combining the two methods. Calculation results show that the proposed method has a certain practical value.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 732-733)

Pages:

1292-1296

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xiao Jun, Wang Chengshan, Zhou Min. An IAHP-based MADM method in urban power system planning. Oroceedings of the CSEE, Vol. 24, pp.50-57, (2004).

Google Scholar

[2] Chen Dayu, Xiao Jun, Wang Chengshan. A FAHP-based MADM method in urban power system planning. Proceedings of the EPSA, Vol. 15, pp.83-88, (2003).

Google Scholar

[3] Wang Jiaming, Liu Wenying, Li Qunju, et al. Optimal configuration of short-circuit current limitation measures based on multilevel fuzzy comprehensive evaluation model. Power System Technology, Vol. 35, pp.125-129, (2011).

Google Scholar

[4] Li Xinyan, Peng Guorong, Zhu Xiangyou, et al. Fuzzy synthetic evaluation method of planning size of distribution grid. Proceedings of the EPSA, Vol. 20, pp.70-77, (2008).

Google Scholar

[5] Wei Gang, Wu Weili, Liu Jia, et al. Comprehensive judgement for power system planning alternatives based on SE-DEA model. Power System Technology, Vol. 31, pp.12-16, (2007).

Google Scholar

[6] Guo Yajun. Comprehensive evaluation thoery, methods and applications. Beijing: Science Press, (2007).

Google Scholar

[7] Nie Hongzhan, Lu Pan, Qiao Yi, et al. Comprehensive fuzzy evaluation for transmission network planning scheme based on entropy weight method. Power System Technology, Vol. 33, pp.60-64, (2009).

Google Scholar

[8] Lin Jikeng, Li Tongfei, Zhao Ziming, et al. Assessment on power system black-start schemes based on entropy-weighted fuzzy comprehensive evaluation model[J]. Power System Technology, Vol. 36, pp.115-120, (2012).

Google Scholar

[9] Liu Sifeng, et al. Gray system theory and its applications. Beijing: Science Press, (2010).

Google Scholar

[10] Zhang Guoli, Zhang Hui, Kong Qian. Fuzzy math basic and its applications. Beijing: Chemical industry press, (2011).

Google Scholar

[11] He Yongxiu, et al. Electricity comprehensive evaluation method and its applications. China Electric Power Press, (2011).

Google Scholar