Efficiency Evaluation Model of Power Transmission & Transformation Project Investment Based on AHP-Fuzzy Method

Article Preview

Abstract:

This article builds an efficiency evaluation model. Using AHP method, an evaluation indicator system is established, and the weights of the indicators are calculated. This paper applies Fuzzy Evaluation method to determine the membership function of qualitative and quantitative indicators, and then synthesizes the indicator weights and the evaluation matrix to get the fuzzy comprehensive evaluation result. Finally, a case of a certain power transmission & transformation project is studied, and the comprehensive evaluation result of its economic benefit is moderate.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 732-733)

Pages:

1303-1307

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Gang Wei Weili Wu Danyun Hu etc Comparative Analysis of Economy Benefit Evaluation Methods for Investment in Power Industry Projects[J] Journal of Shanghai University of Electric Power 2007 23(1) 83-87.

Google Scholar

[2] Shubo Xu White The principles of Analytic Hierarchy Process Tianjin (1998).

Google Scholar

[3] Ming Zeng Kuo Tian Na Li et al Transmission Investment Decision Based on Fuzzy Real Options Method under Uncertain Environment[C] 2009 Sixth International Conference on Fuzzy Systems and Knowledge Discovery Beijing 2009 355-360.

DOI: 10.1109/fskd.2009.693

Google Scholar

[4] Luis Baringo Antonio J Conejo Transmission and Wind Power Investment[J] IEEE Transactions on Power Systems 2012 27(2) 885-893.

DOI: 10.1109/tpwrs.2011.2170441

Google Scholar