Strategy for Breaker Failure by Communication Implementation

Article Preview

Abstract:

This main purpose of this paper is to study the implementation of the strategy for breaker failure under the condition of communication exchange in the power system. The method of breaker failure strategy in case of IEC61850 (Communication Networks and Systems in Substations) GOOSE (Generic Object Oriented Substation Event) aims to fast transmit signal to isolate faulty positions for maintaining safety security. The current strategy for breaker failure in substations is to use hardwire solutions to implement related applications for breaker failure. For integrating protective relays in substations, IEC61850 GOOSE schemes can customize a ring construct based on TCP/IP Ethernet to have flexible dispatch of smart grid solutions.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 732-733)

Pages:

1334-1337

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] J.L. Blackburn: Protective Relaying: Principles and Applications, third ed., Marcel Dekker, New York (2007).

Google Scholar

[2] T.S. Sidhu and P.K. Gangadharan: Control and automation of power system substation using IEC61850 communication. in Proc. of IEEE Conf. on Control Applications (2005), pp.1331-1336.

DOI: 10.1109/cca.2005.1507316

Google Scholar

[3] A.P. Apostolov: High speed peer-to-peer communications based bus protection. in Proc. IEEE PES Winter Meeting. Vol. 2 (2001), p.693–698.

DOI: 10.1109/pesw.2001.916938

Google Scholar

[4] P. Kundur: Power System Stability and Control, McGraw-Hill (1994).

Google Scholar

[5] T.V. Cutsem and C. Vournas: Voltage Stability of Electric Power Systems, Kluwer Academic Publishers (1998).

Google Scholar

[6] C.W. Taylor: Power System Voltage Stability, McGraw-Hill (1994).

Google Scholar