Interruptible Load Risk Analysis Based on Portfolio Theory

Article Preview

Abstract:

Due to the uncertain price and stochastic load, power supply companies will face the trade-off between profits and risks when exercising Interruptible Load Management (ILM). Customers of different type are looked as sub-markets with different risk and benefit. A model is established for Interruptible Load (IL) in the framework of portfolio theory, with the object of maximizing the expected profits and risks of conditional value at risk (CVaR). Genetic Algorithm (GA), is adopted to solve the model. Finally, a numerical example is served for demonstrating the market property of high profits accompanied by high risks and the feasibility of the proposed model, thus a reference is provided to a power supply company to manage risks.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 732-733)

Pages:

1427-1431

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] D K Kirschen. Demand-side View of Electricity Markets. IEEE Transactions on Power Systems. Vol.18,No.2(2003),p.520

DOI: 10.1109/tpwrs.2003.810692

Google Scholar

[2] B. Kankar, H. J. Bollen Math, E. Daalder Jaap. Real Time Optimal Interruptible Tariff Mechanism Incorporating Utility-Customer Interactions. IEEE Transactions on Power Systems, Vol.15,No.2 (2000),p.700

DOI: 10.1109/59.867162

Google Scholar

[3] Y. FANG, Y.Z. Li. Modeling and implementation of incentive interruptible load contracts in electricity markets, Power System Technology,Vol.28,No.17(2004),p.41-46 .

Google Scholar

[4] J.G. Wu, J. Y. Liu, D.W. Duan, et al. A practical compensation mechanism for the interruptible loads in the power market environment Journal of Sichuan University,Vol. 37,No.1 (2005),p.90.

Google Scholar

[5] W. Gedra Thomas, P. Varaiya Pravin. Markets and Pricing for Interruptible Electric Power. IEEE Transactions on Power Systems.Vol8,No. 1 (1993),p.122

DOI: 10.1109/59.221257

Google Scholar

[6] Le Anh Tuan, B. Kankar. Competitive Framework for Procurement of Interruptible Load Services[J]. IEEE Transactions on Power Systems, Vol.18,No. 2(2003),p.889

DOI: 10.1109/tpwrs.2003.810998

Google Scholar

[7] Y.Zhang, Y.B. Zhang, Y.J. Cao, et,al. An evaluating model of interruptible load uncertain risks and returns based on evidence theory. Power System Protection and Control.Vol.37,No.16 (2009),P1.

Google Scholar

[8] Y.L. Wang, Q.C.Xu. Research on Purchasing Portfolio strategies of Large Consumers with the interruptible load. 2012 Asia-Pacific Power and Energy Engineering Conference (APPEEC), 27-29 March ,2012,p.1.

DOI: 10.1109/appeec.2012.6307424

Google Scholar

[9] S. Sarkhani, S. Soleymani, B. Mozafari, H. Afaghzadeh. Impact of Distributed Generation and Interruptible Load on Energy Supply Strategies of Distribution Companies in Day-Ahead Market. Electrical Power Distribution Networks (EPDC), 2011 16th Conference. 19-20 April (2011),p.1.

DOI: 10.1007/s13369-014-0981-2

Google Scholar

[10] G.K. Toh, H.B. Gooi, Operating Reserve of Thermal Unit Systems with Interruptible Loads. TENCON 2009-2009 IEEE REGION 10 CONFERENCE, Vol.1-4(2009), p.338.

DOI: 10.1109/tencon.2009.5395949

Google Scholar

[11] R. Tyrrell Rockafellar,Uryasev Stanislav。Optimization of conditional value-at-risk [J]. The Journal of Risk, , Vol.2,No.3(2000)p,21.

Google Scholar

[12] M. Zhou, G.Y. Li, Y. Zheng, et al. Optimal Electricity Procurement for Load Service Entity Incorporating with Reserve and Risks[C]. 2004 International Conference on Power System Technology, Singapore, 21-24 November, (2004) ,p.1189.

DOI: 10.1109/icpst.2004.1460182

Google Scholar

[13] J. Xu, Peter B. Luh, Frederick B. White,et al. Power Portfolio Optimization in Deregulated Electricity Markets With Risk Management[J]. IEEE Transactions on Power Systems, Vol. 21, No. 4(2006),p.1653.

DOI: 10.1109/tpwrs.2006.879272

Google Scholar

[14] Available on http://www.ecerb.gov.cn/publicJsp/newsdetail.jsp?infoId=(2089)

Google Scholar