The Feasible Analysis of Transformer Fast Reenergizing with Neutral Point Ungrounded

Article Preview

Abstract:

The feasibility of transformer fast reenergizing with neutral point ungrounded after the external fault being removed is analyzed in this paper. By calculating overvoltage and discriminating magnetizing inrush current, it analyzes four ways to restore power of transformer and chooses the optimal strategy which is safe and time-saving. The result shows that in the case of transformer neutral point ungrounded, closing the low-voltage circuit side breaker before the high-voltage, which can effectively limit over-voltage in a safe range. The second harmonic characteristic of magnetizing waveform may disappear, while the intermittent angle characteristics are still significant. With the help of the intermittent angle principle, transformer differential protection may not misuse. The average time for each customer interruption is reduced from 40 minutes to 10 minutes and saves an hour for engineer on the way back and forth. It will greatly improve power supply reliability.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 732-733)

Pages:

958-964

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] YU Huapeng, CHEN Shuiming, YU Hongqiao, et al. Calculation of Overvoltage on Neutral Point of 110kV Power Transformers and Corresponding Protection Strategy[J]. Power System Technology, 2011, 35(3) : 152(in Chinese).

Google Scholar

[2] X. Lin, et al. The ultra-saturation phenomenon of loaded transformer energization and its impacts on differential protection, , IEEE Trans on Power Delivery, 2005, 20(2) : 1265–1272.

DOI: 10.1109/tpwrd.2004.833919

Google Scholar

[3] H. Weng, X. Lin, and P. Liu, Studies on the operation behavior of differential protection during a loaded transformer energization, , IEEE Trans on Power Delivery, 2007, 22(2): 1386-1391.

DOI: 10.1109/tpwrd.2007.900211

Google Scholar

[4] LIU Zhong-ping, LU Yu-ping , YUAN Yu-bo. Study of Transformer Recovery Inrush After Clearance of External Faults[J]. Automation of Electric Power Systems, 2005, 29(8): 41-23 (in Chinese).

Google Scholar

[5] YANG Gaokui. The discussion of ungrounded main transformer on 110 kV side neutral grounded knife operation[J]. Electric power of Hubei, 2008, 32(6): 30-31(in Chinese).

Google Scholar