p.1464
p.1468
p.1472
p.1476
p.1480
p.1484
p.1488
p.1493
p.1498
The Research for Delaying the Bottom Water Coning in Horizontal Wells Application Balance Screen Pipe
Abstract:
When horizontal wells are used to exploit reservoir with bottom water, oil wells water breakthrough prematurely due to water coning, water-free oil recovery is reduced. The reason of the formation of horizontal well water cone is analyzed. Then analysis of the mechanism using balanced screen pipe to inhibit bottom water coning in horizontal well is completed. According to the existing screen pipe size, screen configuration is optimized. Horizontal section pressure distribution is controlled by the balanced screen pipe, and then flow of horizontal well sections is adjusted. Bottom water coning speed of all well sections is controlled. An example is calculated by the software which established and the result shows that optimization method can improve water-free oil recovery.
Info:
Periodical:
Pages:
1480-1483
Citation:
Online since:
August 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: