p.1625
p.1629
p.1637
p.1641
p.1647
p.1656
p.1662
p.1666
p.1671
The Logistics Risk Assessment Studies of the Large Equipment of Hydropower Project Based on Three-Dimensional Structure
Abstract:
With the global economic integration of the sustainable development, international companies increased investment in China as well as numerous international projects in favor of ' made in China ', project logistics in China is being closely watched by construction industry. It is important significance of the high risk of project logistics solutions for risk assessment in the meticulous management of engineering project and under the trend of risk control requirements. Based on the T hydropower project as an example, first this article analysis the hydropower equipment logistics risk factors through the Hall of three-dimensional risk factors for three dimensional analysis model, then according to the method of fault tree analysis, from qualitative and quantitative perspectives on risk for the occurrence of the minimum cut sets, the minimum path sets, top event probability and the probability importance degree are analyzed .Through the analysis of the results, it may occur in the process of risk for large equipment logistics and puts forward the corresponding countermeasures and measures.
Info:
Periodical:
Pages:
1647-1655
Citation:
Online since:
August 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: