Nighttime Monitoring and Assessment Technology of Subgrade Settlement for Chengdu-Guanxian Line during Operation Period

Article Preview

Abstract:

The criterion for residual deformation of Substructure of ballasteless track on railway passenger dedicated line is extremely strict in order to satisfy the safety and comfort requirements of the high-speed train during operation period, urgent need to strengthen the ballastless track lines settlement deformation observation, prediction and assessment technology. Based on Chengdu-Guanxian line, this paper puts forward observation programs of subgrade settlement combined with the characteristics of Subgrade Settlement through the analysis of the influence factors of subgrade settlement deformation and key consideration about the factors of nighttime observation precision. It shows that the monitoring and assessment technology could meet the requirements through the analysis of field data, it can be guidance of railway management departments to make maintenance plan. Some advices provide reference for the monitoring and assessment of high-speed railway subgrade settlement during operation period.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

13-18

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] China Railway Construction Corp [2006] number158, Passenger Dedicated Railway Ballastless Track conditions Technical Guidelines for Assessing[S] Beijing: China railway publishing house, (2006)

Google Scholar

[2] He Zhiyong, Dai Shaoping, predictive analysis for highway soft foundation settlement in the operation period [J]. Journal of China & Foreign Highway, 2011, 31(1):19-21

Google Scholar

[3] Song Jian, Li Mingling, Zhou Quanneng. The results of the assessment and its reasonable control in the subgrade settlement observation [J], railway standard design, 2010(2):4-6

Google Scholar

[4] Cao Xinwen, Cai Ying, Su Qian, research of high speed railway subgrade deformation control, subgrade engineering, 1998(2):38-41

Google Scholar

[5] Gu Xiangsheng, discussion on some issues in construction of subgrade of passenger dedicated line, journal of railway engineering society, 2005(1):31-38.

Google Scholar

[6] You Changlong Li Dianlong, settlement and deformation of passenger dedicated line and its countermeasure[J], journal of railway science and engineering, 2005, 2(5):9-12

Google Scholar

[7] Wang Zhihong, control analysis of ballastless track railway subgrade settlement after construction [J], Journal of Changsha Railway University, 2008,9(1):213-214

Google Scholar

[8] Chen Shanxiong, WangXiaogang, Jiang Lingfa, Dai Zhangjun, settlement characteristics and engineering significance of subgrade surface for railway passenger dedicated line [J], rock and soil mechanics, 2010, 31(3):702-707

Google Scholar

[9] Dong Liang ,Cai Degou, Ye Yangsheng, Zhang Qianli, Zhao Chenggang, a method for predicting the cumulative deformation of high-speed railway subgrades under cyclic train loads[J], china civil engineering journal: 2010,43(6):100-108

Google Scholar

[10] Wang Jingsong, Chen Zhenggang, Liao Jianchun, the observation and prediction of expressway soft sbugrade settlement in the operation period[J], subgrade engineering, 2008 (2):24-25

Google Scholar

[11] Specifications for the first and second order leveling(GB/T12897-2006)[S] Beijing: China railway publishing house, (2006)

Google Scholar

[12] Specifications for survey engineering of high speed railway(TB10601-2009)[S] Beijing: China railway publishing house, (2009)

Google Scholar