The Construction Technique of the Beam Slab Structure being Filled Large-Span Prestressed Lightweight Materials

Article Preview

Abstract:

Abstract: With the rapid development of Chinese economy, more and more requirements of large public buildings, large space and has more functions, the engineering design, construction and bring many technical problems, in order to solve the technical problem, the construction of scientific research departments continue to research and development of new materials, new technology, new methods of construction, city of Puyang stadium the tennis project 44M*24M large span structure, adopts the ‘made of light material combined unit filled prestressed concrete cast-in-situ slab’ structure technology, solves the light, save steel, concrete, reduces the structure thickness, good economic practicability.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

73-77

Citation:

Online since:

August 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xuyan, Hang weimin. Application of cast-in-place prestressed concrete hollow slab structure [J]. Building Technique Development. 2003 (5).

Google Scholar

[2] Guo zhenhai, Shi xudong. The principle and analysis of the reinforced concrete [M]. Beijing: Tsinghua University Press, (2003).

Google Scholar

[3] Zhu huiwei, Song yingheng. The construction technology large-span post-tensioned unbonded prestressed concrete cast-in-situ hollow slab [J]. Building technology. 2011. 12.

Google Scholar

[4] Shi tejun. The construction of unbonded prestressed hollow slab [J]. Science & Techno. 2011. 10.

Google Scholar