Optimization on Resource-Constrained Multi-Project Scheduling of Electric Multiple Unit Overhaul

Article Preview

Abstract:

As the numbers and running distance of Chinese high-speed trains increase, many electric multiple units (EMU) gradually enter into overhaul stage, EMU maintenance bases face challenges of transition from practical exploration, regular production to lean production. In accordance of business requirement, built a model of dynamic resource allocation, task splitting, and soft precedence constraints. By the design of nonlinear decline inertia weight factor, a refined particle swarm optimization (PSO), as well as the corresponding parallel transformation scheme from particle to schedule, is presented. Finally, computational analysis is performed to validate the model and algorithm on optimization capabilities, resource utilization and performance.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

457-462

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ying ying, et al. Journal of Zhejiang University: Engineering Science, 2009(43), 1: 23-27.

Google Scholar

[2] Hong Zhang, et al. International Journal of Project Management 2006(24): 83-92.

Google Scholar

[3] Jirachai Buddhakulsomsiri, et al. European Journal of Operational Research 2006(175): 279-295.

Google Scholar

[4] Nazareth T, et al. European Journal of Operational Research, 1999(112), 2: 347-366.

Google Scholar

[5] Kolisch R. Eur J Operat Res 1996(90): 320–330.

Google Scholar