The Research of Fully Mechanized Tunneling Efficient Construction Organization Design of the Inclined Shaft in Hecaogou Mine

Article Preview

Abstract:

Construction organization design is an important technology economy file of guiding the project construction. The sectional area of auxiliary inclined shaft is 21.6m2, belongs to big section of long inclined shaft. Based on the geological condition, auxiliary inclined shaft in Hecaogou mine optimized the construction organization design and adopted four-eight cross recycling way. Thanks to the use of high-power EBZ318H comprehensive tunneling machine, it has realized the rapid construction of inclined well, achieved the good grades of 227 m in the highest month .The well had good engineering quality and no safety accidents, implementing the fast construction of safe and efficient, high quality, economic benefit and social benefit . At the same time, it had accumulated rich experience for big section of long inclined shaft construction.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 753-755)

Pages:

835-838

Citation:

Online since:

August 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Huaimin Yang, Bingjiang Gong, Xinzhan Li. New Characteristic of Organization Design of Construction in Mine[C]/New Development of Mine Construction and Geotechnical Engineering. Beijing: Chinese Society for Rock Mechanics and Engineering, 1997: 297-299.

Google Scholar

[2] Changcun He. Discussion on the Organization of Mechanization of the Major Projects[J]. Construction Mechanization, 2008, 29(7): 51-53.

Google Scholar

[3] Zhaochen Ren, Weidong Yao, Zhaohui Qiu. Big Cross Section Crag Lane High-speed Driving Construction Organization and Craft[J]. Coal Technology, 2009, 28(4): 193-194.

Google Scholar

[4] Yuming Qin, Yuedong Huang, Dejun Pan. Qick Drifting Construction and Processing of Xiaohenshan Material Shaf, [J]. Coal Technology, 2005, 24(2): 81-83.

Google Scholar

[5] Huayu Zhou, Zhisheng Li. Rapid Construction of Shaft Supporting Mechanization Organization and Management [J]. Coal Technology, 2008, 27(5): 165-166.

Google Scholar