[1]
Carter, C.R. and Ellram, L.M., 1998. Reverse logistics: A review of the literature and framework for future investigation. Journal of Business Logistics 19(1), 85–102.
Google Scholar
[2]
Fleischmann, M., Bloemhof-Ruwaard, J.M., Dekker, R., van der Laan, E., van Nunen, J.A.E.E., and van Wassenhove, L.N., 1997. Quantitative models for reverse logistics: A review. European Journal of Operation Research 103(1), 1–17.
DOI: 10.1016/s0377-2217(97)00230-0
Google Scholar
[3]
Mahadevan, B., Pyke, D.F., and Fleischmann, M., 2003. Periodic review push inventory policies for remanufacturing. European Journal of Operational Research 151, 536–551.
DOI: 10.1016/s0377-2217(02)00627-6
Google Scholar
[4]
van der Laan, E.A. and Ruud, H.T., 2006. Simple heuristics for push and pull remanufacturing policies. European Journal of Operation Research 175, 1084–1102.
DOI: 10.1016/j.ejor.2005.06.030
Google Scholar
[5]
Chi-Chung Lin, Chun-Wei Lin, Defective item inventory model with remanufacturing or replenishing in an integrated supply chain, International Journal of Integrated Supply Management, Vol. 6, Nos. 3/4, (2011).
DOI: 10.1504/ijism.2011.044889
Google Scholar
[6]
Ming-Wei Weng, Rung-Hung Su, Determining The Optimal Production Lot Size For Two-Stage Production System With Allowable Shortage, Imperfect Processes And Rework, IJEI: International Journal of Engineering and Industries, Vol. 3, No. 2, p.53 ~ 64, (2012).
DOI: 10.4156/ijei.vol3.issue2.7
Google Scholar
[7]
Qi Lian, Suling Jia, Research on Two-stage Supply Chain Ordering Strategy Optimization Based on System Dynamics, AISS: Advances in Information Sciences and Service Sciences, Vol. 4, No. 23, p.16 ~ 24, (2012).
DOI: 10.4156/aiss.vol4.issue23.2
Google Scholar
[8]
Chi-Chung Lin, Chwen-Tzeng Su, Choosing the Best Supplier using the TOPSIS Method and Improving Deteriorated or Defective Inventory with Batch Processing, IJACT: International Journal of Advancements in Computing Technology, Vol. 4, No. 23, p.600 ~ 608, (2012).
DOI: 10.4156/ijact.vol4.issue23.72
Google Scholar
[9]
Salameh, M.K. and Jaber, M.Y., 2000. Economic production quantity model for items with imperfect quantity. International Journal of Production Economics 64, 59–64.
DOI: 10.1016/s0925-5273(99)00044-4
Google Scholar