A Purchase and Sell Model in Distribution Market Considering Risk

Article Preview

Abstract:

In distribution market, because there are a lot of uncertainty factors such as price and load, so it is a big problem to balance benefit and risk for generation and distribution companies. Since they are both inclined to avoid the market risk, in order to make the most profit for both companies, a purchase and sell model in distribution market based on contract is proposed in this paper. And a power repurchase term is added in the contract to avoid the risk incurred by load fluctuation. Using CVaR(conditional risk at value) as the risk measuring criterion, a two-layer schedule model is set up to simulate the sale and purchase behaviors of generation and distribution companies. And the optimal power sale price for generation company and optimal power purchase quantity for distribution company are calculated by this model. As the case shows, by setting the different risk level, their market characteristics and relationship also change but always follow the risk avoiding rule. So the model can reduce the risk in distribution market for both companies under certain conditions.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 765-767)

Pages:

3215-3219

Citation:

Online since:

September 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] KIRSCHEN D S.Demand-side view of electicity markets[J].IEEE Transaction on Power System, 2003, 18(2), p.520~527.

Google Scholar

[2] Zhan Xian, Wang Xi-fan, Review of Power Finacial Market[J], 2005, 29(20), p.1~10.

Google Scholar

[3] Bastian J,Zhu Jin-xiang,Banunarayanan V, et al. Forecasting Energy Price in a Competitive Market[J].IEEE Computer Applications in Power, 1999, 12(3), p.40~45.

DOI: 10.1109/67.773811

Google Scholar

[4] L M,WU F F, NI Yi-xin.A Survey on Risk Management in Electricity Market[A]. in: IEEE Power Engineering Society General Meeting[C],(2006).

Google Scholar

[5] LIAO Jing, JIANG Hui, PENG Jian-chun, et al. Risk Assessment on Bidding strategy of Power Generation Companies Based on VaR and CvaR Method[J]. Relay, 2007, 35(11), p.30~34, 43.

Google Scholar

[6] Menniti D,Musmanno R, Scordino N, et al. Managing Price Risk while Bidding in a Multimarket Environemnt[A]. in: IEEE Power Engineering Society General Meeting[C], p.1~10.

DOI: 10.1109/pes.2007.385968

Google Scholar

[7] WANG Ren, SHANG Jin-cheng, ZHOU Xiao-yang, et al. Conditional Risk at Value Based on Optimization of Power Purchasing Portfolio in Multiple Electricity Markets and Risk Management[J]. Power System Technology, 2006, 30(20), p.72~76.

Google Scholar

[8] Caruso E, Dicorato M, Minoia A, et al. Supplier Risk Analysis in the Day-ahead Electricity Market[J]. IEE Proc Gener, Transm, and Distrib, 2006, 153(3), p.335~342.

DOI: 10.1049/ip-gtd:20045123

Google Scholar

[9] Candler W and Norton R, Multilevel programming[R], Techinical Report 20', World Bank Development Research Center, Washington D.C. (1977).

Google Scholar

[10] Bard J F. Geometric and algorithmic developments for a hierarchical planning program[J]. European Journal of Operational Research, 1985, 19, p.372~383.

DOI: 10.1016/0377-2217(85)90133-x

Google Scholar

[11] Rockafellar R T and S Uryasev, Optimization of conditional value-at-risk[J], Journal of Risk, 2000, 3(2), p.21~41.

DOI: 10.21314/jor.2000.038

Google Scholar