Waterway Regulation Effect of the Letianxi Reach between the Three Gorges Project and Gezhouba Project

Article Preview

Abstract:

t is the first implementing waterway navigation project between the Three Gorges Project (TGP) and The Gezhouba Project. Based on analyzing of the navigation-obstructing characteristics, waterway regulation ideas and schemes are put forward. A three-dimensional flow mathematical model is used to simulate the change of water level, flow velocity, flow pattern. And the effect of the regulation project is analyzed and contrasted with and without it. At last, the reasonable regulation scheme is proposed.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 779-780)

Pages:

1152-1155

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] CAO M.X. Ph.D. thesis. Nanjing Hydraulic Research Institute, China, Nanjing. (2005).

Google Scholar

[2] YAO S.M., WANG X.K., ZHANG C., etc. t, Advances in Water Science, 18(3), pp.374-378. (2007).

Google Scholar

[3] HAO. P. Z. Research report. Tianjin: Tianjin Research Institute for Water Transport Engineering, M.O.T. (2009).

Google Scholar

[4] Feng. X. X, Kong. X. W, Zhang. L. Tianjin: Tianjin Research Institute for Water Transport Engineering, M.O.T. (2009).

Google Scholar

[5] Feng. X. X, Li, J. B, Fan. J. C. Journal of waterway and harbor, 31 (6), pp.577-582. (2010).

Google Scholar