Simulating Effect of Anchor Cable Pre-Tension to Supporting Structure

Article Preview

Abstract:

Since the pre-stressed anchor technology became to be used from the beginning of twentieth century, it is widely used with the advantages of its good applicability, high cost performance, good looking appearance and easy green. Pre-stressed anchor achieves the purpose of actively controlling foundation pit deformation by exerting pre-stress on steel strand of its free section. This thesis chooses deep foundation pit engineering, adopt Mohr-Coulomb ideal soil body by finite difference software FLAC3D, and select different anchor pre-tension values to simulate. It combines Lizheng software to do numerical simulation and analytic study on pile-anchor supporting structure. This thesis compares results coming from the two kinds of software, and analyze the impact on row piles' body bending moment, pile top deformation, anchor cable axial force and foundation pit deformation when pre-tension changes.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

525-529

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wenbing Peng, FLAC3D Practical Guide [M]. Beiing: Machinery Industry Press, (2008).

Google Scholar

[2] Sunil. S. Kishnani, Seepage and Soil-structure Interface Effects in Braced Excavations [J]. Journal of Geotechnical Engineering, 1993, 119(5), 912-929.

DOI: 10.1061/(asce)0733-9410(1993)119:5(912)

Google Scholar

[3] Clough G. W., Duncan J. M. Finite Element Analysis of Retaining Wall Behavior [J]. ASCE, 1971, Vol. 97SM, 12: 165-167.

Google Scholar

[4] Beijing Lizheng Software Design Institute. Lizheng Deep Excavation Structural Design S [M](programmed instructions System theory) [M]. Beijing: (2011).

Google Scholar

[5] Ministry of Construction. Technical Specification Architectural Excavation ( JGJ120 – 2012 ) [S]. Beijing: (2012).

Google Scholar