The Optimization of Project Time-Cost Based on Particle Swarm Optimization Algorithm

Article Preview

Abstract:

Project schedule management is the management to each stage of the degree of progress and project final deadline in the project implementation process. Its purpose is to ensure that the project can meet the time constraints under the premise of achieving its overall objectives.When the progress of schedule found deviation in the process of schedule management ,the progress of the plan which have be advanced previously need to adjust.This article mainly discussed to solve the following two questions:establish the schedule optimization model by using the method of linear;discuss the particle swarm optimization (PSO) algorithm and its parameters which have effect on the algorithm:Particle swarm optimization (PSO) algorithm is presented in the time limited project and the application of a cost optimization.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 791-793)

Pages:

1423-1426

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] F. van den Bergh, A.P. Engelbrecht. A study of particle swarm optimization particle trajectories [J]. Information Sciences. 2006, 176: 937-971.

DOI: 10.1016/j.ins.2005.02.003

Google Scholar

[2] Robinson DR. A dynamic programming solution to cost time tradeoff for CPM[J]. Manage Sci. 1975, 22(2): 158-166.

DOI: 10.1287/mnsc.22.2.158

Google Scholar

[3] Feng CW, Liu L, Burns SA. Using genetic algorithms to solve construction time-most trade-off problems[J]. Journal of Computing in Civil Engineering. 1997, 11(3): 184-189.

DOI: 10.1061/(asce)0887-3801(1997)11:3(184)

Google Scholar

[4] FENG Chungwei, LIU Liang, BURNS S A. Stochastic construction time-cost trade-off analysis[J]. Journal of Computing in Civil Engineering. 2000, 14(2): 117-126.

DOI: 10.1061/(asce)0887-3801(2000)14:2(117)

Google Scholar

[5] Patterson JH, Slowinski R, Talbot FB, Weglarz, J. An algorithm for a general class of precedence and resource constrained scheduling problems[A]. Advances in project scheduling. Amsterdam. 1989: 3-28.

DOI: 10.1016/b978-0-444-87358-3.50005-5

Google Scholar