Applying Lean Construction to Construction Project

Article Preview

Abstract:

Lean construction is aimed to improve construction performance by eliminating wastes that do not add value to the customer. This project studies lean construction and its application in concrete construction projects at both the operation and project levels. In conjunction with a concrete contractor, actual concrete construction projects were observed, and problem areas contributing to delay and other wastes were identified. At the project level, the lack of coordination among subcontractors was cited as one of the major factors contributing to schedule delays. This paper proposes to use the last planner concept, the linear scheduling method, and the graphic schedule method to improve communication and look-ahead scheduling. Related software was developed for implementing this scheduling tool. At the operation level, a systematic approach of was identification, operation re-design, and employee training was applied to reduce wastes found in the field operation. A case study of bulkhead installation was used to demonstrate this approach, and a 3D animation was created for employee training.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 834-836)

Pages:

1976-1983

Citation:

Online since:

October 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Ballard, G. (1996). Last planner system of production control. Unpublished doctoral dissertation, University of Birmingham, Birmingham, U. K.

Google Scholar

[2] Harris, R.B., & Ioannou, P. G. (1998). Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124(4), 269–278.

DOI: 10.1061/(asce)0733-9364(1998)124:4(269)

Google Scholar

[3] Higgin, G., & Jessop, N. (1965). Communications in the building industry. London, U.K.: Tavistock.

Google Scholar

[4] Hinze, J.W. (2008). Construction planning and scheduling (3rd ed. ). Upper Saddle Rive, NJ: Pearson Education.

Google Scholar

[5] Howell, G.A. (2007, November 28). What is lean construction-1999. [WWW document]. URLhttp: /www. leanconstruction. org/pdf/Howell. pdf.

Google Scholar

[6] Koskela, L. (1992). Application of the new production philosophy to construction. (Report No. 72). Stanford, CA: Stanford University, Center for Integrated Facility Engineering.

Google Scholar

[7] Koskela, L., Lahdenperä, P., & Tanhuanpää, V. (1996). Sounding the potential of lean construction: A case study. Proceedings of the 4 th Annual Conference of the International Group for Lean Construction. Birmingham, U. K.

Google Scholar

[8] Latham, M. (1994). Constructing the team. London, U.K.: Her Majesty's Stationary Office.

Google Scholar

[9] Lee, S.H., Diekmann, J.E., Songer, A.D., & Brown, H. (1999). Identifying waste: Applications of construction process analysis. Proceedings of the 7thAnnual Conference of the International Group for Lean Construction. Berkeley, CA.

Google Scholar

[10] Tommelein, I.D. (1998). Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), 279–288.

DOI: 10.1061/(asce)0733-9364(1998)124:4(279)

Google Scholar