Risk Analysis of Rapid Construction Schemes Based on the Fuzzy Theory

Article Preview

Abstract:

In the engineering project in Contemporary, Rapid construction is an advanced managing concept which core is fast. On the basis of the fuzzy risk, risk degree and fuzzy probability and risk analysis, this paper analyze the factors affecting rapid construction, and with different construction project factors fuzzy risk evaluation set is established. From the Angle of quantitative the risk analysis of hydraulic engineering in the influencing factors of construction schedule. On the impact of factors on construction schedule to different schemes are obtained quantitative values. We can choose the optimum construction scheme reduces risk.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 838-841)

Pages:

259-264

Citation:

Online since:

November 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] In Chinese) Zengzu Peng, Yunyu Sun, Fuzzy mathematics and the application, Wuhan university press, (2007).

Google Scholar

[2] In Chinese) Hong Xie, Jianjun Liu, Shengdong Zhang, The fuzzy risk analysis method of dam safety, Gansu science and technology, (2007).

Google Scholar

[3] (In Chinese) Hong Zhou, Tao You, Xueqin Wang, Water conservancy project schedule control in risk assessment, Water transportation engineering, 2007. Reference to a book.

Google Scholar

[4] In Chinese) Guangxi longtan gezhouba joint management body of seven Bureau and eight Bureau, Longtan RCC gravity dam construction and management, China Water & Power Press, (2007).

Google Scholar