Risk Analysis of Rapid Construction Schemes Based on the Fuzzy Theory
Abstract:
In the engineering project in Contemporary, Rapid construction is an advanced managing concept which core is fast. On the basis of the fuzzy risk, risk degree and fuzzy probability and risk analysis, this paper analyze the factors affecting rapid construction, and with different construction project factors fuzzy risk evaluation set is established. From the Angle of quantitative the risk analysis of hydraulic engineering in the influencing factors of construction schedule. On the impact of factors on construction schedule to different schemes are obtained quantitative values. We can choose the optimum construction scheme reduces risk.