Safety Risk Analysis of Box-Culvert Jacking Construction by Using Fuzzy Fault Tree Method Based on WBS-RBS

Article Preview

Abstract:

The box-culvert jacking of highway constructions crossing the existing railway is construction difficult and technically complex. If there are safe accidents, it will bring great loss. According to this situation, a new method based on WBS-RBS is presented in this paper to comprehensively identify the risk factors of safety accident with the fault tree, and then the fuzzy probability of basic events are described to triangle fuzzy numbers. Furthermore the happening fuzzy probability of the top event can be calculated. The proposed method provides a scientific method for the safety risk analysis of similar engineering.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 838-841)

Pages:

355-359

Citation:

Online since:

November 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] JING Hao,SHE Fang-tao,SHAO Sheng-jun. Research on measuring and controlling technology of box culvert-jacking [J]. Chinese Journal of Underground Space and Engineering,2007,3(8):1404-1407.

Google Scholar

[2] HOU Yan-juan,ZHANG Din-li,ZHANG Bing-yin. Risk management System of Urban Tunnel Passing through Structures [J]. Chinese Journal of Underground Space and Engineering,2011,7(5):899-995.

Google Scholar

[3] TIAN Hai-bo,SONG Tian-tian. Research of risks and countermeasures on project of metro beneath the Railway [J]. Chinese Journal of Underground Space and Engineering,2007,3(1):147-150.

Google Scholar

[4] ZHOU Hong-bo,GAO Wen-jie,CAI Lai-bing,et al. Risk identification and analysis of subway foundation pit by using fault tree analysis method based on WBS-RBS [J]. Rock and Soil Mechanics,2009,30(9):2703-2707.

Google Scholar

[5] JIA Zhi-wei,JING Guo-xun,ZHANG Qiang. Fault tree analysis of mining fire occurrence based on triangle fuzzy numerals [J]. Journal of Safety and Environment,2004,4(6):62-65.

Google Scholar

[6] ZHENG Jun-jie,LIN Chi-feng,ZHAO Dong-an,et al. Risk assessment of shield tunnel construction cost using fuzzy fault tree [J]. Chinese Journal of Geotechnical Engineering,2011,33(4):501-507.

Google Scholar

[7] WANG Xue,LI Jiu-hong,WANG De-fa. Discussion on effects of culvert box advancing construction on epidermal deformation and the Control Measures [J]. Water Power Engineering,2007,(5):59-61.

Google Scholar

[8] XIE Mie,WANG Xue-feng. Analysis of quality factors of box-culvert jacking and control method [J]. Railway Engineering,2008,(6):12-14.

Google Scholar

[9] ZHANG Xiao-quan,YU Lu,CAO Jun. On the runway excursion hazard management based on the fuzzy hierarchical analysis [J]. Journal of Safety and Environment,2012,12(4):239-242.

Google Scholar

[10] NIE Yan-zhe,DUAN Chang-gui. Natural gas pipeline systems design based on fuzzy decision [J]. Oil and Gas Storage and Transportation,2002,22(6):44-46.

Google Scholar