Research on the Construction Technology of Cross-Prestressed Concrete Pavement

Article Preview

Abstract:

Cross-prestressed concrete pavement, without setting expansion joints, can extend its service life, improve its bearing capacity and make the continuous construction possible. In recent years, it has been successfully applied to toll plazas, short subgrade of the highway and the overweight or overloaded road. Materials choosing, construction method of the cross-prestressed concrete pavement was presented in details and some relevant problems during the construction have been discussed in this paper.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

283-287

Citation:

Online since:

December 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Li Na, Zhang Dongsheng, and Xu Xijuan et al., Study on design method of cross-prestressed concrete pavement, Journal of highway and transportation research and development, No. 11, 2012, p: 178-180. (in Chinese).

Google Scholar

[2] Zhang Dongsheng, Han Sen, Han Weiwei, Li Na, and Lei Zixue, Research on key design parameters of two direction cross-tensioned prestressed cement concrete pavement, Highway, No. 11, 2010, p: 70-73. (in Chinese).

Google Scholar

[3] Wang Meizhai, Research on prestressed concrete pavement design, North China University of water resource and electric power, Zhengzhou, china, 2004. (in Chinese).

Google Scholar

[4] Qian Zhendong, Huang Wei, and Niu Hedong, Construction of prestressed concrete test road, East china highway, No. 3, 2000, p: 36-39. (in Chinese).

Google Scholar