A Launching Pattern in a Mixed Model Assembly Line

Article Preview

Abstract:

This paper aims to sequence the production plan of a condenser unit of an air-conditioned assembly line, which is a manual assembly line. In this case there are six different models with different required production rate that must be assembled simultaneously. The assembly line consists of twenty four workstations with thirty four workers. Due to the fact that the cycle time of each condenser model is varied. Thus, it is difficult to design a launching pattern so that the production requirement of each model is exactly met at each production hour. In turn, the production demand of some models can be satisfied while other models cannot be met. In order to solve this problem, the fixed rate launching algorithm is applied and the result is considered satisfactory.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 875-877)

Pages:

1160-1164

Citation:

Online since:

February 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] M. P . Groover: Automation, Production Systems, and Computer-Integrated Manufacturing. (Prentice Hall, NJ 2001), pp.545-557.

Google Scholar

[2] A. Drexl, A. Kimms: Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints, Management Science Vol. 47 (2001), pp.480-491.

DOI: 10.1287/mnsc.47.3.480.9777

Google Scholar

[3] B.D. Parello, W.C. Kabat, L. Wos: Job-shop scheduling using automated reasoning: a case study of the car sequencing problem, Journal of Automatic Reason, Vol. 2 (1986), pp.1-42.

DOI: 10.1007/bf00246021

Google Scholar

[4] M. Jin, Y. Luo, S.D. Eksioglu: Integration of production and outbound logistics in the automotive industry, Int. J. of production Economics, Vol. 113 (2008), pp.766-774.

DOI: 10.1016/j.ijpe.2007.11.003

Google Scholar

[5] Y. Monden: Toyota Production System. Institute of Industrial Engineers Press, Atlanta (1993).

Google Scholar

[6] N. Boysen, M. Fliedner, A. Scholl: Sequencing mixed model assembly lines: survey, classification and model critique, European Journal of Operational Research 192 (2009), pp.349-373.

DOI: 10.1016/j.ejor.2007.09.013

Google Scholar

[7] B.R. Sarkar, and H. Pan: Designing a mixed-model assembly line to minimize the costs of idle and utility times, Computers & Industrial Engineering , Vol. 34 (1998), pp.609-628.

DOI: 10.1016/s0360-8352(97)00320-3

Google Scholar

[8] T. Kiss: On the complexity of the car sequencing problem, Operational Research letters, Vol. 32 (2004), pp.331-335.

Google Scholar

[9] S. Prombanpong, and C. Dumkum: A Mathematical Approach to Design Launching Pattern for a Mixed-Model Production Line, The Proc. of 11th Asia Pacific Industrial Engineering and Management Systems Conference, Malaysia(2010).

Google Scholar

[10] S. Prombanpong, C. Dumkum, and E. Satranonda : A Fixed Rate Launching of Mixed Model Car sequencing in the Multiple Assembly Lines. The Proc. of IEEE Int. Conf. on Industrial Engineering and Engineering Management, (2010), pp.1266-1270.

DOI: 10.1109/ieem.2010.5674378

Google Scholar

[11] J. Miltenburg: Level schedules for mixed-model assembly lines in just-in-time production systems, " Manage Science , Vol. 35 (1989), pp.192-207.

DOI: 10.1287/mnsc.35.2.192

Google Scholar

[12] W. Liu, Y. Han: Car Sequencing in Mixed-model Assembly Lines from the Perspective of Logistics Optimization, in Proc. of the IEEE Int. Conf. on Automation and Logistics, Qingdao, China (2008), pp.952-957.

DOI: 10.1109/ical.2008.4636287

Google Scholar

[13] Y.C. Choi, Y.D. Kim, J.Y. Bang: Scheduling algorithms for an air- conditioned manufacturing system composed of multiple parallel assembly line, Springer, London. (2012).

Google Scholar