A Scheduler Design for Coordinating Network Control System Load with Redundancy

Article Preview

Abstract:

For a network control system (NCS) with redundancy structure, this paper designs a network scheduler, which can coordinate network load and support redundancy to enhance system availability, safety and reliability. Considering the Quality of Service (QoS) and the Quality of Control (QoC) to constitute the objective function of network resources scheduling, the scheduler uses fuzzy system to establish the network resource scheduling strategy, which dynamically decides communication channels of network control loops by calculating online and real-time scheduling. The scheduler can improve real-time performance and availability of the NCS, and quickly switch redundancy network under fault conditions to ensure reliability of the NCS. At last, the experiment results demonstrate that the proposed scheduler meets the requirements of the resource scheduling and redundancy network, and can effectively improve the performance of the NCS when network load increases.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

624-628

Citation:

Online since:

February 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] HESPANHA J P, NAGHSHTABRIZI P, XU Y. Proc. IEEE, 2007, 95(1): 138-162.

Google Scholar

[2] WANG Y Q, YE H, DING S, et al. Automatica, 2009, 45(10): 2427-2434.

Google Scholar

[3] Dajun Du, Minrui Fei. Chinese Journal of Scientific Instrument, 2011, 32(3): 713-720.

Google Scholar

[4] Nian Liu, Xulun Zhou, Yande Shen. Control Engineering of China, 2011, 18(3): 429-433.

Google Scholar

[5] Zhongda Tian, Xianwen Gao. Electric Machines and Control, 2013, 17(1): 94-101.

Google Scholar

[6] Xiao Wu, Jian Wu. Measurement and Control Technology, 2010, 29(2): 78-84.

Google Scholar

[7] Xuan Hung Nguyen, Guy Juanole, Gerard Mouney. 2010 8th IEEE International Workshop on Digital Object Identifier.

Google Scholar

[8] Michael S. Branicky, Stephen M. Phillips, Wei Zhang. Scheduling and Feedback Co-Design for Networked Control Systems [C] /Proceeding of the 41st IEEE Conference on Decision and Control, December, 2002, Las Vegas, Nevada USA.

DOI: 10.1109/cdc.2002.1184679

Google Scholar

[9] Dandan Chen, Li Xia, Haifeng Wang. Scheduling Algorithm in Networked Control Systems based on Importance [C] /2008 ISECS International Colloquium on Computing, Communication, Control, and Management.

DOI: 10.1109/cccm.2008.204

Google Scholar

[10] Feng Xia, Xiaohua Dai, Zhi Wang, et al. Feedback Based Network Scheduling of Networked Control Systems [C]. /2005 International Conference on Control and Automation (ICCA2005), June 27-29, 2005, Budapest, Hungary.

DOI: 10.1109/icca.2005.1528309

Google Scholar

[11] Hongwei Zhang, Wenjuan Zhang. Journal of Northeast Normal University, 45(1): 65-70.

Google Scholar

[12] Junbo Wang, Bugong Xu. Control and Decision, 2008, 23(5): 551-554.

Google Scholar