p.748
p.753
p.757
p.761
p.765
p.769
p.774
p.783
p.790
Study of Non-Equilibrium Arms Bridge Circuit for Water Plugging of Horizontal Wells in Sandstone Reservoir
Abstract:
In view of rapid water cut increasing and poor oil recovery with banded distribution with high permeability belt in sandstone reservoir of Huabei Oilfield,the electrical bridge technique for water shut-off is proposed. Based on years practice of vertical wells and similarity in Ohms and Darcys laws,the electrical model involved variable resistors series/parallel instead of reservoir distribution,the arm-bridge circuit combined with signal detection. Then response of the circuit by variable water shut-off could be simulated. The results indicated that,the driving pressure and seepage quantity at mid-low permeability channel could be greatly improved by the strong in-depth water-plugging at high permeability channel (L=20~40m),and the low permeability flowrate increased to a maximum of 55.3%. Then the gel dam in-depth fluid diversion technique was verified by water plugging and circuit simulation. The conclusions provided a valuable guidance for horizontal wells development enhanced.
Info:
Periodical:
Pages:
765-768
Citation:
Online since:
April 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: