Analyzing the Cost of High-Rise Buildings after Second Design Based on the Bill of Quantity Valuation Mode

Article Preview

Abstract:

The second design of construction drawings is an important part for building. It is not only a simple analysis and a modification of the drawings, but is the purpose to save cost using re-designed based on construction plan and techniques. For this purpose and other advantages of second design, the current large-scale projects, especially high-rise buildings, are required for secondary design. This article mainly introduces the second design, and uses the value engineering and the weighted average method to analyze the problem of cost savings and allocation. It proposes the approaches and methods of cost savings through the second design, obtains a reasonable method of allocation ratio calculation and general distribution ratio, as well as provides a strong reference to improving the economics of high-rise buildings.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 919-921)

Pages:

1429-1432

Citation:

Online since:

April 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Fudong Dai. The generation and development of high-rise building and the prediction of future trends. [J]. Chinese Engineering Science, 1999, 11 (1).

Google Scholar

[2] Huifeng Tian, Huan Zhang, Jianqing Ruan, Yun Liang. Domestic development of high-rise building and application of green technologies [J]. Proceedings of the eighth international conference on green building and building energy Saving.

Google Scholar

[3] Hongbiao Zhang. The study of building structure design cost optimization [J]. 2011 (11) 55 to 57.

Google Scholar

[4] Jian fengLi. Project valuation and cost management [M]. China electric power press, 2005 (9).

Google Scholar

[5] Guofeng Yu, Mangmang Lu. Construction budget and bill of quantity valuation [M]. Tongji University Press, (2005).

Google Scholar

[6] Hongyang Li, Xian Shi, Yueshui Li. The bill of quantity valuation and the bids [M]. China's building materials industry press, 2006 (1).

Google Scholar

[7] Qiongyue Liang. The cost saving measures in construction stage [J]. China's high-tech enterprises, 2012 (4) 74 ~ 75.

Google Scholar

[8] Xiaoning Liu, Lan Zhang, Xiang Zhu. Introduction to the steel structure design and engineering cost saving control [J]. Journal of fujian construction, 2012 (9) 27 ~ 29.

Google Scholar