The Operation Safety Evaluation of Xi'an Subway

Article Preview

Abstract:

Line 2 of Xi’an subway is the earliest subway in Shaanxi , its safety has not been fully and thoroughly checked because of the perfect record of non-fault during its operation. In this paper, facility, management and fault indexes are set up, and the and indexes are also built through the organization and responsibility analysis of subsystem so as to safety assessment index system. Finally, AHP and fuzzy evaluation method are used to evaluate the subway operation results and propose appropriate corrective measures.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 919-921)

Pages:

902-906

Citation:

Online since:

April 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Baohua Mao, Fan Jiang, Qian Liu, Yi Wei, Xiamiao Li, Hong Xu. Urban Rail Transit [M]. Science Press. 2001: pp.1-2.

Google Scholar

[2] Guiping Xiao, Xiaoning Li. Traffic safety engineering[M]. China Railway Press. 2012(2): pp.175-190.

Google Scholar

[3] Yang He. Beijing Subway Operation Safety Assessment and Evaluation Analysis of Signal System[D]. Master Thesis of Beijing University of Chemical Technology. (2006).

Google Scholar