p.883
p.887
p.891
p.895
p.902
p.907
p.915
p.921
p.925
The Operation Safety Evaluation of Xi'an Subway
Abstract:
Line 2 of Xi’an subway is the earliest subway in Shaanxi , its safety has not been fully and thoroughly checked because of the perfect record of non-fault during its operation. In this paper, facility, management and fault indexes are set up, and the and indexes are also built through the organization and responsibility analysis of subsystem so as to safety assessment index system. Finally, AHP and fuzzy evaluation method are used to evaluate the subway operation results and propose appropriate corrective measures.
Info:
Periodical:
Pages:
902-906
Citation:
Online since:
April 2014
Authors:
Price:
Сopyright:
© 2014 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: