Analyze and Improvement of Production Site Based on IE

Article Preview

Abstract:

Productivity level was inseparable with production site layout, facility and operation personnel arrangement, the production site facility and production line were optimized basis of IE through detailed analysis of automobile roof rail production process. Added quick die change equipment, online polish machine, measured several parameters before and after improvement using time measure method. The improvement enable the whole production line staff reduced 2, production beat increased 17%, saturation of personnel increased 26%, the production line balance and productivity were improved, brought good economic benefit for the enterprise.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 926-930)

Pages:

3754-3757

Citation:

Online since:

May 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] E.S. QI: Industrial Engineering and Management, Vol. 9 (2006), pp.7-9.

Google Scholar

[2] B. Xiong , Y.H. Ge and Z.Y. Chen: Industrial Engineering and Management , Vol. 18 (2013) No. 3, pp.76-82.

Google Scholar

[3] F. Guo, G.M. Zhang and J. Wen: Industrial Engineering and Management, (2006) No. 2, pp.119-123.

Google Scholar

[4] Y.R. Wang: Machine Tool & Automatic Manufacturing Technique, (2012) No. 10, pp.100-102.

Google Scholar

[5] Y.W. Ye, X. EN. Wang, H. Lin and Y.F. Jiang: Machinery Manufacturing , (2010) No. 5, pp.70-73.

Google Scholar

[6] W.H. Shi, X.Q. Ye, Y.W. Zhao and J.H. Zhang: China Manufacturing Information, Vol. 41 (2012) No. 17, pp.78-82.

Google Scholar

[7] B.J. Du, H.P. Wang, J. Liang and J.E. Zhao: Machiney design and Manufacture, (2010) No. 7, pp.181-183.

Google Scholar

[8] L.N. Hou, H.Y. Wang and W.W. Jia: Industrial Engineering Journal, Vol. 14(2011) No. 4, pp.124-128.

Google Scholar