Distribution Automation in Case of Tie Bus between Two Feeders at Donekoy Substation in Laos

Article Preview

Abstract:

This paper proposesthe coordination between recloserandfuse link, reclosertorecloser, and recloserwith over current relay in tie feeder 1, 2ofDonekoy substationin Laos PDR.Disilent power factory software is used for simulation toimprove the operation of protective devicesand analyze the operating timein the distribution system.The operating coordination of recloser, fuse and overcurrent relayis improved. Resetting their functionality to limit the fault,the coordinating power aimsto reduce the problems of outages on distribution and also makes the system reliability.In case of maintenance circuit breaker, the 22 kV - tie bus applies to loads feeder 2 to ensure the stability power to appliances load of customers.Therecloser3 was installed on feeder 2 to protect the faults,and coordinates with recloser2 while the short circuit occursat fault2.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 931-932)

Pages:

873-877

Citation:

Online since:

May 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] M.H. Kim, S.H. Lim, J.F. Moon, J.C. Kim, Method of recloser-fuse coordination in a power distribution system with superconducting fault current limiter, IEEE Trans on applied superconductivity. 20(2010) 1164-1167.

DOI: 10.1109/tasc.2010.2040821

Google Scholar

[2] S. Santoso, T.A. Short, Identification of fuse and recloser operations in a radial distribution system, IEEE Trans on power delivery. 22 (2007) 2370-2377.

DOI: 10.1109/tpwrd.2007.905386

Google Scholar

[3] L. Comasseto, D.P. Bernardon, L.N. Canha, A.R. Abaide, Softwarefor automaticcoordination ofprotectiondevices in distribution system, IEEE Trans on power delivery. 23(2008)2241-2246.

DOI: 10.1109/tpwrd.2008.919264

Google Scholar

[4] PA. Pittsburgh, Electrical distribution system protection, cooper Industries, 3rd ed, (1990).

Google Scholar

[5] J. Lewis Blackburn, Protective relaying-principles and applications, 1987, pp.181-199.

Google Scholar

[6] K. Guan, M. Choi, S. Lee. S. Lim, Coordination method for protective devices of closed-loop distribution system, EEEIC 11th. (2012) 47-52.

DOI: 10.1109/eeeic.2012.6221466

Google Scholar

[7] A. Fazanehrafat, S.A.M. Javadian, S.M.T. Bathaee, Maintaining the recloser-fuse coordination distribution systems in presence of DG by determining DG size, DPSP IET 9th. (2008)132-137.

DOI: 10.1049/cp:20080024

Google Scholar