[1]
David Baccarini, The concept of project complexity-a review. International Journal of Project Management., Vol. 14, No. 4, pp.201-204, (1996).
DOI: 10.1016/0263-7863(95)00093-3
Google Scholar
[2]
P.E.D. Love, G.D. Holt, L.Y. Shen, H. Li, Z. Irani, Using systems dynamics to better understand change and rework in construction project management systems., International Journal of Project Management 20 (2002) 425–436.
DOI: 10.1016/s0263-7863(01)00039-4
Google Scholar
[3]
Alexandre Rodrigues, the role of system dynamics in project management., International Journal of Project Management Vol. 14, No. 4, pp.213-220, (1996).
Google Scholar
[4]
John D. Sterman(1992), system dynamics modeling for project management., Sloan School of Management, Massachusetts Institute of Technology, (http: /web. mit. edu/jsterman/www/).
Google Scholar
[5]
Forrester, J Industrial Dynamics MIT Press, USA (1961).
Google Scholar
[6]
Alexandre Rodrigues , John Bowers, System dynamics in project management: a comparative analysis with traditional methods., System Dynamics Review Volume 12 Number 2 Summer (1996).
DOI: 10.1002/(sici)1099-1727(199622)12:2<121::aid-sdr99>3.0.co;2-x
Google Scholar
[7]
Roberts, E. 1964. The Dynamics of Research and Development. New York: Harper& Row.
Google Scholar
[8]
Kelly, T. J. 1970. The Dynamics of R&D Project Management. MIT M.S. Mgt Dissertation (300).
Google Scholar
[9]
COOPER K G. Naval ship production: A Claim Settled and a Framework Built., Interfaces, 1980, 10( 6) : 20- 36.
DOI: 10.1287/inte.10.6.20
Google Scholar
[10]
Ofori, G. 1991. Programmes for improving the performance of contracting firms in developing countries: A review of approaches and appropriate options., Constr. Manage. Econom., 9, 19–38.
DOI: 10.1080/01446199100000003
Google Scholar
[11]
Stephen O. Ogunlana; Heng Li; and Fayyaz A. Sukhera, System Dynamics Approach to Exploring Performance Enhancement in a Construction Organization., J. Constr. Eng. Manage. 2003. 129: 528-536.
DOI: 10.1061/(asce)0733-9364(2003)129:5(528)
Google Scholar
[12]
Gui Yea, Hongping Yuan, Liyin Shen, Hongxia Wang, Simulating effects of management measures on the improvement of the environmental performance of construction waste management., Resources, Conservation and Recycling 62 (2012) 56– 63.
DOI: 10.1016/j.resconrec.2012.01.010
Google Scholar
[13]
Hongping Yuan, A model for evaluating the social performance of construction waste management., Waste Management 32 (2012) 1218–1228.
DOI: 10.1016/j.wasman.2012.01.028
Google Scholar
[14]
Moonseo Park and Feniosky Peña-Mora, Dynamic change management for construction: introducing the change cycle into model-based project management., System Dynamics Review Vol. 19, No. 3, (Fall 2003): 213–242.
DOI: 10.1002/sdr.273
Google Scholar
[15]
Sangwon Han, M. ASCE; SangHyun Lee, M. ASCE; and Feniosky Peña-Mora, M. ASCE, Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects., J. Constr. Eng. Manage. 2012. 138: 98-109.
DOI: 10.1061/(asce)co.1943-7862.0000406
Google Scholar
[16]
SangHyun Lee, Feniosky Peña-Mora, Understanding and managing iterative error and change cycles in construction., System Dynamics Review Volume 23 Number 1 Spring (2007).
DOI: 10.1002/sdr.359
Google Scholar
[17]
Peter E. D. Love, David J. Edwards, and Zahir Irani, Forensic Project Management: An Exploratory Examination of the Causal Behavior of Design-Induced Rework., 0018-9391/$25. 00 © 2008 IEEE.
DOI: 10.1109/tem.2008.919677
Google Scholar
[18]
Farnad Nasirzadeh, Abbas Afshar, Mostafa Khanzadi, System dynamics approach for construction risk analysis., International Journal of Civil Engineerng. Vol. 6, No. 2, June (2008).
Google Scholar
[19]
Farnad Nasirzadeh, Abbas Afshar, and Mostafa Khanzadi, Dynamic risk analysis in construction projects., Can. J. Civ. Eng. 35: 820–831 (2008).
DOI: 10.1139/l08-035
Google Scholar
[20]
Feniosky Pena-Mora and Moonseo Park, Dynamic planning for fast-tracking building construction projects., J. Constr. Eng. Manage. 2001. 127: 445-456.
DOI: 10.1061/(asce)0733-9364(2001)127:6(445)
Google Scholar
[21]
I.A. Motawa , C.J. Anumba, S. Lee , F. Peña-Mora, An integrated system for change management in construction., Automation in Construction 16 (2007) 368–377.
DOI: 10.1016/j.autcon.2006.07.005
Google Scholar
[22]
SangHyun Lee, M. ASCE; Feniosky Peña-Mora, M. ASCE; and Moonseo Park, M. ASCE, Quality and Change Management Model for Large Scale Concurrent Design and Construction Projects., J. Constr. Eng. Manage. 2005. 131: 890-902.
DOI: 10.1061/(asce)0733-9364(2005)131:8(890)
Google Scholar
[23]
SangHyun Lee, M. ASCE; Feniosky Peña-Mora, M. ASCE; and Moonseo Park, M. ASCE, Web-Enabled System Dynamics Model for Error and Change Management on Concurrent Design and Construction Projects., J. Comput. Civ. Eng. 2006. 20: 290-300.
DOI: 10.1061/(asce)0887-3801(2006)20:4(290)
Google Scholar
[24]
Robert J Chapman, The role of system dynamics in understanding the impact of changes to key project personnel on design production within construction projects., International Journal of Project Management Vol. 16, No. 4, pp.235-247, (1998).
DOI: 10.1016/s0263-7863(97)00043-4
Google Scholar
[25]
Asim Karim and Hojjat Adeli, Oo information model for construction project management., J. Constr. Eng. Manage. 1999. 125: 361-367.
DOI: 10.1061/(asce)0733-9364(1999)125:5(361)
Google Scholar
[26]
Moonseo Park, M. ASCE; Madhav Prasad Nepal; and Mohammed Fadhil Dulaimi, Dynamic Modeling for Construction Innovation., J. Manage. Eng. 2004. 20: 170-177.
DOI: 10.1061/(asce)0742-597x(2004)20:4(170)
Google Scholar
[27]
Moonseo Park, Model-based dynamic resource management for construction projects., Automation in Construction 14 (2005) 585–598.
DOI: 10.1016/j.autcon.2004.11.001
Google Scholar
[28]
SangHyun Lee; Sangwon Han; and Feniosky Peña-Mora, Integrating Construction Operation and Context in Large-Scale Construction Using Hybrid Computer Simulation., J. Comput. Civ. Eng. 2009. 23: 75-83.
DOI: 10.1061/(asce)0887-3801(2009)23:2(75)
Google Scholar
[29]
Feniosky Peña-Mora; Sangwon Han; SangHyun Lee; and Moonseo Park, Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach., J. Constr. Eng. Manage. 2008. 134: 701-710.
DOI: 10.1061/(asce)0733-9364(2008)134:9(701)
Google Scholar
[30]
Benjamin P. Thompson, Lawrence C. Bank, Use of system dynamics as a decision-making tool in building design and operation., Building and Environment 45 (2010) 1006–1015.
DOI: 10.1016/j.buildenv.2009.10.008
Google Scholar
[31]
Amin Alvanchi, SangHyun Lee, and Simaan M. AbouRizk, Dynamics of workforce skill evolution in construction projects., Can. J. Civ. Eng. 39: 1005–1017 (2012).
DOI: 10.1139/l2012-087
Google Scholar
[32]
Mostafa Khanzadi, Farnad Nasirzadeh, Majid Alipour, Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects., Automation in Construction 22 (2012) 368–376.
DOI: 10.1016/j.autcon.2011.09.015
Google Scholar
[33]
Omer Tatari; Daniel Castro-Lacouture, A.M. ASCE; and Mirosław J. Skibniewski, M. ASCE, Performance Evaluation of Construction Enterprise Resource Planning Systems., J. Manage. Eng. 2008. 24: 198-206.
DOI: 10.1061/(asce)0742-597x(2008)24:4(198)
Google Scholar
[34]
Carol Menassa, A.M. ASCE; and Feniosky Peña Mora, M. ASCE, Hybrid Model Incorporating Real Options with Process Centric and System Dynamics Modeling to Assess Value of Investments in Alternative Dispute Resolution Techniques., J. Comput. Civ. Eng. 2010. 24: 414-429.
DOI: 10.1061/(asce)cp.1943-5487.0000044
Google Scholar
[35]
W. Zhao, H. Ren, V.S. Rotter, A system dynamics model for evaluating the alternative of type in construction and demolition waste recycling center – The case of Chongqing, China., Resources, Conservation and Recycling 55 (2011) 933– 944.
DOI: 10.1016/j.resconrec.2011.04.011
Google Scholar
[36]
Hongping Yuan, Abdol R. Chini , Yujie Lu, Liyin Shen, A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste., Waste Management 32 (2012) 521–531.
DOI: 10.1016/j.wasman.2011.11.006
Google Scholar