Method of Determining the Length of Approach Slab for Highway Bridge

Article Preview

Abstract:

Approach slab is mainly used to slowdown or reduce uneven settlement of bridge heads as far as possible. Setting approach slab at back of bridges and culverts is an effective and necessary way to avoid faulting slab ends between abutment and road in high-grade highway. It has come into general application and achieved good results. But nowadays, approach slab is designed based on previous experience or being set a size parameter directly instead of being made a special design. Theory and experience that the design based on is unreasonable. Author confirm the need for setting approach slab and give the reference value about length of approach slab for different grade highway according to analysis and study on the forced state of the moving vehicles at highway-bridge junction with or without approach slab.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 953-954)

Pages:

1657-1662

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Ye Jianshu . Lai Guolin and so on. Investigation and analysis of Yang jiang segment approach slab . Huadong Road , 1995, 97 ( 6 ).

Google Scholar

[2] People Industry Standard General Specification for Highway Bridge Design JTG60-2004 People's Communications Press (2004).

Google Scholar

[3] Ye Jianshu Settlement at Bridge Approach Control Standards The journal of Southeast University 1997. VOL27, No. 3:12-17.

Google Scholar

[4] Gao Dazhao , Yuan Juyun. Soil science and soil mechanics. People's Communications Press 2004.

Google Scholar

[5] Yu Yonghua Approach slab force characteristics and adaptability The journal of Traffic and Transportation Engineering 2006. 4 15-18.

Google Scholar

[6] Lai Guolin.Annex Research reports Bridgehead Bump control measures II: Recommendations about the bridge allowable value [Δias] . Institute of Transportation Engineering , Southeast University.

Google Scholar

[7] Gu feng.The design of bridgehead approach slab.road, 1996, N0.1:1-5.

Google Scholar

[8] Wang yi.Design approach of the Japanese bridge approach slab.Urban Roads Bridges & Flood Control.2006.6.

Google Scholar