Research on the Met Mast Siting Used in Post Assessment of Mountain Wind Farm

Article Preview

Abstract:

Abstract. For a mountain wind farm in southern China, the paper used CFD software, METEODYN WT, to simulate the wind in all directions to assess their speed-up factor, turbulence intensity, inflow angle and horizontal deviation caused by the terrain. The turbulence intensity, the horizontal deviation and the inflow angle in the met-mast position should be low or small, and the speed-up factor should be able to represent the average level of all the wind turbine sites. The positional relationship of the wind turbine and met-mast is reference to IEC61400-12-1. The paper provided two optional areas.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 953-954)

Pages:

443-447

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] WuZhang, Cheng Da, Tianyu Zou. Design of Wind Farm Performance Improvement Program [J]. Sun Energy, 2005(12): 50-52[In Chinese].

Google Scholar

[2] Li An Zhang, Qi Lihua, Gang Li. Post evaluation methods and procedures for construction projects [J]. Economic Review, 2005, 13(11): 44-47 [In Chinese].

Google Scholar

[3] Peng Huai, Xiaolin Wang. Discussion on post evaluation of wind farm design [J]. Renewable Energy Resources, 2009(8)97-99[In Chinese].

Google Scholar

[4] Qiang Zhou, Yuyu Ding , Xu Cheng, Bin Fu. The application of WT software in the met mast siting and wind energy resource assessment of wind farm[J]. Wind Energy, 2012(8): 72-75[In Chinese].

Google Scholar