[1]
Wang Jianghong. Study on Substation Location for Planned UHV Power Grid in Hubei[J] ,. Hubei Power, 2009, 04: 47-49 +74.
Google Scholar
[2]
Wu Yaowen , etc. The Twelfth Five-Year Plan on designing of Hubei grid, [Z] . (2010).
Google Scholar
[3]
Zhang Wenliang,Zhou Xiaoxin,Guo Jianbo,et a1.Feasibility of ±1 000kV ultra HVDC in the power grid of China[J].Proceedings of the CSEE,2007,27(28):1-7(in Chinese).
Google Scholar
[4]
ShenYangwu, Peng Xiaotao, Mao XunShi, Xing Jie. Comprehensive Evaluation Indexes Framework and Evaluation Method on Location Layout of UHV Substations [J],. Power System Technology, 2012, 12: 44 -53.
Google Scholar
[5]
Guo country Shen Shanshan, Study on construction necessity and schemes connecting to power grid for Nanchang UHV AC transmission project [J],. Electric Power, 2010, 08: 40-44.
Google Scholar
[6]
Lu jing, Study on Optimizing Configuration for Connecting Power Sources in Guangxi Power Grid into the Main Power System[J],. Guangxi Electric Power Technology, 2002, 01: 1 -4 +12.
Google Scholar
[7]
Peng Hui, Zhang Xin , Li Yajun , Tao Rin , Influence of Selection of Connecting Position for UHVDC Transmission Line With Transmission Capacity of 10 GW on the Stability of Receiving-End System in Chongqing Power Grid [J],. Power System Technology , 2011, 11: 25 -28.
Google Scholar
[8]
Zhou Li , the iron yuan , Kang Yi , Zheng Yingfen , Fang Xiaosong , Chen , Juan-Juan Huang, Study on the location and system scheme of Jingmen substationin 1000kV Jindongnan-Nanyang-Jingmen UHVAC transmission project [J],. Electric Power , 2006, 07: 65 -69.
DOI: 10.1109/drpt.2011.5993968
Google Scholar
[9]
LIU Jiankun , HU Ya Shan, Zhao Jingbo , "Prospects to the Influences of the Ultra High Voltage Grid on Jiangsu Power System.
Google Scholar
[9]
[J]". Jiangsu Electrical Engineering , 2010, 01: 1-3.
Google Scholar
[10]
Fang Xiaosong , Zhong Sheng , Chen Zheng, CHEN Ling-yun , WANG , System scheme study of Zhuzhou converter stationin ±800k VUHVDC transmission project From Xiluodu Left Bank to Zhuzhou [J],. Electric Power, 2006, 03: 50 -54.
Google Scholar