Numerical Simulation Analysis of Coal Mining with Paste-like Backfill under Water Based on UDEC

Article Preview

Abstract:

Based on the instance of extremely thick coal seam mining under aquifer in Gonggeyingzi Coal Mine, the theoretical calculation for the height of water flowing fracture zone in this coal mine was 30.6m and calculation model was established. Analyzed by the UDEC software, the surface displacement of backfill mining was 1532mm and the height of overburden rock plastic zone was 36.5m. Compared with 135m away from coal roof to aquifer, slicing backfill mining under aquifer was confirmed to be safe and feasible based on the theoretical calculation and analysis of UDEC. The results provided the basis for the safety of extremely thick coal seam mining under aquifer in this coal mine.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 962-965)

Pages:

935-938

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] State Bureau of Coal Industry enacted. Mining regulations under buildings, water, railway and coal pillars. [S]. Beijing: China Coal Industry Publishing House, 2000: 10-12. In Chinese.

Google Scholar

[2] HUANG Yucheng, SUN Henghu, SHI Zhaobing, et al. Coal Science and Technology 2003, (10): 51-53. In Chinese.

Google Scholar

[3] Guo Wenbing, SHAO Qiang, YIN Shixian, et al. Journal of Mining and Safety Engineering. 2006, 23 (3) : 324-328. In Chinese.

Google Scholar

[4] TAN Fuqing, JU Feng, LIU Zhan, et al. Safty In Coal Mines. 2012, 43 (4) : 21-24. In Chinese.

Google Scholar