Study of the Assessment Method for Risk Matrix in Large Mining Steel Structure Large Steel Structure

Article Preview

Abstract:

KONIAMBO project affiliated to the OFFSHORE OIL ENGINEERING CO., LTD is the world's first smelting plant using large modular construction and integration, which is the first integrated, modular building project with many potential risks .In this paper, project risk management system, control method and requirements were built based on risk matrix assessment method, potential risks in each stage and aspect were evaluated, controlled and managed,then risk management guarantee is provided for KONIAMBO project implementation.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 962-965)

Pages:

964-967

Citation:

Online since:

June 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] PaulR, Carvey PR, Lansdowne ZF. Air Joumal of Logistics (1998), pp.16-19.

Google Scholar

[2] Lansdowne ZF, Woodwar BS. Air Joumal of Logistics (1996), pp.27-29.

Google Scholar

[3] Zhou Hongbo, Gu Jun. Shanghai Research Institute of Building Sciences in Chinese, (2008).

Google Scholar

[4] Zhu Difei, Fang Donping et al. China Civil Engineering Journal in Chinese (2006), pp.119-123.

Google Scholar

[5] Huang Hongwei, Zhu Lin, et al. Journal of Geotechnical Engineering in Chinese (2007), pp.1103-1107.

Google Scholar