[1]
Rondinel-Oviedo, D. R. (2021). Construction and demolition waste management in developing countries: a diagnosis from 265 construction sites in the Lima Metropolitan Area. International Journal of Construction Management, 1–12
DOI: 10.1080/15623599.2021.1874677
Google Scholar
[2]
REINVENTING CONSTRUCTION: A ROUTE TO HIGHER PRODUCTIVITY. (2017). McKinsey Global Institute. Published. https://www.mckinsey.com/~/media/McKinsey/Industries/Capital%20Projects%20and%20Infrastructure/Our%20Insights/Reinventing%20construction%20through%20a%20productivity%20revolution/MGI-Reinventing-Construction-Executive-summary.pdf
Google Scholar
[3]
Abanda, F., Tah, J., & Cheung, F. (2017). BIM in off-site manufacturing for buildings. Journal of Building Engineering, 14, 89–102
DOI: 10.1016/j.jobe.2017.10.002
Google Scholar
[4]
Blayse, A.M.; Manley, K. Key influences on construction innovation. Constr. Innov. 2004, 4, 143–154
DOI: 10.1108/14714170410815060
Google Scholar
[5]
Almeida, A. (2019, 10 enero). Impacto de la cuarta revolución industrial en la industria de la construcción. RPP. https://rpp.pe/columnistas/alexandrealmeida/impacto-de-la-cuarta-revolucion-industrial-en-la-industria-de-la-construccion-noticia-1174467
DOI: 10.3989/ic.1980.v32.i323.2339
Google Scholar
[6]
Marinho, A., Couto, J., & Teixeira, J. (2021). RELATIONAL CONTRACTING AND ITS COMBINATION WITH THE BIM METHODOLOGY IN MITIGATING ASYMMETRIC INFORMATION PROBLEMS IN CONSTRUCTION PROJECTS. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 27(4), 217–229
DOI: 10.3846/jcem.2021.14742
Google Scholar
[7]
Kunz, J.; Fischer, M. Virtual Design and Construction: Themes, Case Studies and Implementation Suggestions. CIFE Working Paper 097. 2012. Available online: https://stacks.stanford.edu/file/druid:gg301vb3551/WP097_0.pdf (accessed on 4 December 2022).
Google Scholar
[8]
Rischmoller, L., Reed, D., Khanzode, A., & Fischer, M. (2018). Integration Enabled by Virtual Design & Construction as a Lean Implementation Strategy. 26th Annual Conference of the International Group for Lean Construction. Published
DOI: 10.24928/2018/0521
Google Scholar
[9]
Del Savio AA, Vidal Quincot JF, Bazán Montalto AD, Rischmoller Delgado LA, Fischer M. (2022) Virtual Design and Construction (VDC) Framework: A Current Review, Update and Discussion. Applied Sciences. 2022; 12(23):12178
DOI: 10.3390/app122312178
Google Scholar
[10]
Kunz, J., & Fischer, M. (2020). Virtual design and construction. Construction Management and Economics, 38(4), 355–363
DOI: 10.1080/01446193.2020.1714068
Google Scholar
[11]
Aslam, M., Gao, Z., & Smith, G. (2021). Integrated implementation of Virtual Design and Construction (VDC) and lean project delivery system (LPDS). Journal of Building Engineering, 39, 102252
DOI: 10.1016/j.jobe.2021.102252
Google Scholar
[12]
Migilinskas, D., Popov, V., Juocevicius, V., & Ustinovichius, L. (2013). The Benefits, Obstacles and Problems of Practical Bim Implementation. Procedia Engineering, 57, 767–774
DOI: 10.1016/j.proeng.2013.04.097
Google Scholar
[13]
Majumdar, T., Rasmussen, S. G., del Savio, A. A., Johannesdottir, K., Hjelseth, E., & Fischer, M. (2022). A Comparative Analysis of Production Metrics across VDC Implementations. Construction Research Congress 2022
DOI: 10.1061/9780784483978.104
Google Scholar
[14]
Hughes, S. W., Tippett, D. D., & Thomas, W. K. (2004). Measuring Project Success in the Construction Industry. Engineering Management Journal, 16(3), 31–37
DOI: 10.1080/10429247.2004.11415255
Google Scholar
[15]
Fischer, M., Jr, H. A. W., Reed, D., & Khanzode, A. (2017). Integrating Project Delivery. Wiley.
Google Scholar
[16]
Universidad de Lima. (2019, 20 diciembre). MasterBehavior. https://www.ulima.edu.pe/ulima/noticias/campus-ulima-el-futuro-comienza-ahora
Google Scholar
[17]
Universidad de Lima Master Plan. (s. f.). Sasaki. Retrieved 2021, from https://www.sasaki.com/projects/universidad-de-lima-master-plan/
Google Scholar
[18]
2D & 3D BIM collaboration platform. BIM collaboration software from. (2022, 1 septiembre). Revizto. https://revizto.com/en/
Google Scholar
[19]
Zoom Video Communications. (s. f.). Video Conferencing, Cloud Phone, Webinars, Chat, Virtual Events. Zoom. https://zoom.us/
Google Scholar
[20]
Memon A.H., Abdul-Rahman I., Zainun N.Y. and Abd-Karim (2013). Web-based risk assessment technique for time and cost overrun (WRATTCO)-A framework. ProcediaSocial Behavioural Sciences, Vol. 129, pp.178-185.
DOI: 10.1016/j.sbspro.2014.03.664
Google Scholar
[21]
Shehu Z., Holt G.D., Endut I.R. and Akintoye A. (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, Vol. 5(1), pp.52-68. https://doi-org.ezproxy.ulima.edu.pe/
DOI: 10.1108/BEPAM-10-2013-0056
Google Scholar
[22]
Love P.E.D. (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, Vol. 128 (1), pp.18-29
DOI: 10.1061/(ASCE)0733-9364(2002)128:1(18)
Google Scholar
[23]
Ford, S., Aouad, G., Kirkham, J., Brandon, P., Brown, F., Child, T., Cooper, G., Oxman, R., & Young, B. (1995). An information engineering approach to modelling building design. Automation in Construction, 4(1), 5–15
DOI: 10.1016/0926-5805(94)00029-m
Google Scholar
[24]
Shenoy, R. Zabelle ,T. (2016). New Era of Project Delivery – Project as Production System. Project Production Institute, 2. https://projectproduction.org/journal/new-era-of-project-delivery-project-as-production-system/
Google Scholar