A New-Structured Tower Crane

Article Preview

Abstract:

Advantages and disadvantages of present tower crane's upper structures are analyzed in this paper. According to the theory of prestressing jib, through combination design, a kind of structure is presented which can realize multiple use and greatly improve the hoisting capacity. Mechanical analysis and contrasts are done for old and new designs by finite element analysis software ALGOR. Finally, an example is given to verify the validity and feasibility of the design

You might also be interested in these eBooks

Info:

Periodical:

Pages:

288-292

Citation:

Online since:

August 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Z.Y. Jin: Construction mechanization, Vol. 10(2007), pp.15-22.

Google Scholar

[2] Y.N. Cha: Research on Fatigue Life of WQ6 Flat Top Tower Crane(Ph.D., Jinan University, China 2010), pp.28-32.

Google Scholar

[3] Q. Feng, Z.P. Xu, G.T. Xie and Y.X. Chen: Construction machinery, Vol. 11(2008), pp.87-90.

Google Scholar

[4] X.J. Zheng, Y.M. Han: Construction Mechanization, Vol. 5(2001), pp.54-55.

Google Scholar