Extension of the Value Stream Mapping Approach to the Comprehensive Design of a Lean Sheet Metal Manufacturing System: An Industrial Case Study

Article Preview

Abstract:

This paper reports the practical experiences made with extending the Value Stream Mapping (VSM) approach to the comprehensive design of a lean manufacturing system for the series production of sheet metal cable tray systems. The use of VSM for analyzing the production of repetitive units has proven to be successful in different industries. It is based on a classification of all products into product families and creates one current and future state map for each product family. This approach and the related guidelines for future state optimization are very helpful but not sufficient for a comprehensive manufacturing system (re) design, because the relation between product families value streams, the overall material flow optimization, as well as the segmentation and layout of factory remains unclear. Thus, the purpose of this paper is to develop a design procedure based on the investigation of an industrial case that allows the integrated optimization of the single value streams, their compilation in material-flow optimized production segments, and finally the (re) design of production logistics and factory layout. The findings of this research are limited due to the focused nature of a case study based research. However, the obtained results encourage assuming its transferability to similar problems.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

537-544

Citation:

Online since:

April 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Rother, M. and Shook, J. (1998), Learning to See – Value-stream mapping to create value and eliminate muda, Lean Enterprise Institute: Massachusetts/USA.

Google Scholar

[2] Erlach, K. (2005), Rapid and Agile Production by Value Stream Oriented Factory Planning, Proceedings of the International Conference on Changeable, Agile, Reconfigurable and Virtual Production (CARV 05), Munich, Germany.

DOI: 10.1007/978-3-319-02054-9_76

Google Scholar

[3] Woodside, A. G. and Wilson, E. J. (2003), "Case study research methods for theory building", Journal of Business & Industrial Marketing, Vol. 18 No. 6-7, pp.493-508.

DOI: 10.1108/08858620310492374

Google Scholar

[4] Vissak, T. (2010), "Recommendations for Using the Case Study Method in International Business Research", The Qualitative Report, Vol. 15 No. 2, pp.370-388.

Google Scholar

[5] Perren, L. and Ram, M. (2004), "Case-study method in small business and entrepreneurial research", International Small Business Journal, Vol. 22 No. 1, p.83–101.

DOI: 10.1177/0266242604039482

Google Scholar

[6] Serrano, I., Ochoa, C. And De Castro, R. (2008), Evaluation of value stream mapping in manufacturing system redesign, International Journal of Production Research, Vol. 46, No. 16, 15 August 2008, 4409–4430

DOI: 10.1080/00207540601182302

Google Scholar

[7] Voss, C., Tsikriktsis, N. and Frohlich, M. (2002), Case research in operations management. Int. J. Oper. Prod. Manag., Vol. 22, p.195–219.

DOI: 10.1108/01443570210414329

Google Scholar

[8] Tapping, D., Luyster, T. and Shuker, T. (2002), Value Stream Management, Productivity Press: New York.

Google Scholar

[9] Braglia, M., Carmignani and G., Zammori, F. (2006), "A new value stream mapping approach for complex production systems", International Journal of Production Research, Vol. 44 No. 18-19, pp.3929-3952.

DOI: 10.1080/00207540600690545

Google Scholar

[10] Lian, Y. and Van Landeghem, H. (2002), An application of simulation and value stream mapping in lean manufacturing, in 14th European Simulation Symposium, 2002 (SCS Europe BVBA), available at: http://www.scs-europe.net/services/ess2002/PDF/log-11.pdf (accessed: 10.11.2012)

Google Scholar

[11] Harris, R., Harris, C. and Wilson, E. (2003), Making Materials Flow, The Lean Enterprise Institute: Massachusetts.

Google Scholar

[12] Smalley, A. (2004), Creating Level Pull, The Lean Enterprise Institute: Massachusetts, USA.

Google Scholar

[13] Matt, D.T. (2008), Template based Design of Lean Production Systems. Journal of Manufacturing Technology Management, Vol. 19, No. 7 and 8, pp.783-797.

DOI: 10.1108/17410380810898741

Google Scholar

[14] Arnold, D. (1995), Materialflusslehre, Vieweg-Verlag, Braunschweig/Wiesbaden.

Google Scholar

[15] Kohler, U. (2007), Methodik zur kontinuierlichen und kostenorientierten Planung produktionstechnischer Systeme, Dissertation iwb/TUM, Munich/Germany.

Google Scholar