Labor Productivity in Projects of Construction and Industrial Maintenance

Article Preview

Abstract:

This paper is an accomplished investigation in a main industrial group of the city of Altamira, México, as part of a program of improvement of the labor productivity in the area of construction and maintenance of Aguila Industrial Group. The research focuses on the development of a methodology to assess the labor productivity of the industrial maintenance projects. In the methodology, we propose the use of a work sampling tool in order to identify the main factors that affect labor productivity as well as we proposes apply lean manufacturing tools to improvement labor productivity. In the paper, we discuss the implementation findings of the developed methodology as well as the preliminary outcomes of the main factors affecting labor productivity in the construction and maintenance industry; such outcomes provide a guide in the labor productivity management in one of the sectors that exhibits less development grade in most of the Latin-American countries.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

139-144

Citation:

Online since:

June 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Botero, L. &. Guía de mejoramiento continuo para la productividad en la construcción de proyectos de vivienda. REVISTA Universidad EAFIT, (2004), pp.50-64.

Google Scholar

[2] Botero, L. Mejoramiento de la productividad en proyectos de vivienda, a través de la filosofía Lean construction (construcción sin pérdidas). Research Project. Departamento de Ingeniería Civil, Universidad EAFIT, (2002), p.164.

DOI: 10.46631/jefas.2010.v15n28.06

Google Scholar

[3] CIO. 6th International Conference on Industrial Engineering and Industrial Management. Revised on January 08, 2012 enhttp: /www. cio2012. org.

Google Scholar

[4] G. Fernández, J. Teoría y Práctica del mantenimiento industrial. Madrid: FC editorial, (2012).

Google Scholar

[5] Konorti, E. Give ratio-delay a chance. Industrial Engineer Magazine, (2012) 44, pp.34-39.

Google Scholar

[6] Mundel, M. E. Motion And Time Study Improving Productivity. USA: Prentice-Hall, Inc. (1978).

Google Scholar

[7] Murray R. y Larry J. Stephens, 2009 Estadística 4 edición,. Mc Graw Hill. México D. F.

Google Scholar

[8] Niebel, B., & Freivalds. Ingeniería industrial, métodos estándares y diseño del trabajo. México: Alfaomega, (2001), p.512.

Google Scholar