Dynamic Component Load of the Prefabricated Panels during their Handling

Article Preview

Abstract:

Prefabricated panels are handled by various types of crane during the assembly (bridge crane in the production hall and construction crane on site). The panel is loaded with inertial forces during manipulation caused by crane's starting and breaking movement. These forces significantly affect the design of the transport system (anchors, ropes, etc. In literature there are different values of dynamic coefficient for different types of crane. In the experiment, the magnitude of the force in the crane hinge was measured during the handling of various panel types in the production hall and during the construction site installation. The static value of the force size was determined at the moment when the panel freely hanged on crane hinge. The measured values are further compared with the manufacturer’s recommendation for the design of the transport anchors.

You might also be interested in these eBooks

Info:

Periodical:

Solid State Phenomena (Volume 272)

Pages:

82-87

Citation:

Online since:

February 2018

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2018 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Richtlinienreihe VDI/BV-BC 6205 Transportanker und Transportankersysteme für Betonfertigteile – Grundlagen, Bemessung, Anwendung, VDI-Fachbereich Bautechnik, Düsseldorf, Germany, 2012, 16 pp. (in German).

Google Scholar

[2] HD-Socket Lifting System: Technical Product Information [online], HALFEN Vertriebsgesellschaft GmbH, Langenfeld, Germany, 2016 [cit. 2017-01-27], 44 pp. Available from: http://downloads.halfen.com/catalogues/de/media/catalogues/liftingsystems/HD_16-E.pdf.

Google Scholar