Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: December 2011
Authors: Dong Sheng Xie, Xiao Li Rong, Shi Lin Chen
While, the material insecurities mainly include water gushing and water leakage in tunnel, nonuniform settlement and excessive subsidence, surface collapse and the instability of supporting structures etc. while, most of these material insecurities are also caused by human’s unsafe behaviors.
Establishing professional teams for security risk management and highlighting prevention and forecast of the major accidents.
Therefore, it is urgent to establish professional teams for security risk management as soon as possible.
The prediction and prevention of major accidents have to be enhanced by technology research, which main include collapse of weak and broken rocks, water and mud inrush in karst district, rock burst and water seepage in the underwater tunnel and so on.
It is anxious to raise the level of progress and highlight the prediction and prevention of major accidents relying on professional management and technical means.
Establishing professional teams for security risk management and highlighting prevention and forecast of the major accidents.
Therefore, it is urgent to establish professional teams for security risk management as soon as possible.
The prediction and prevention of major accidents have to be enhanced by technology research, which main include collapse of weak and broken rocks, water and mud inrush in karst district, rock burst and water seepage in the underwater tunnel and so on.
It is anxious to raise the level of progress and highlight the prediction and prevention of major accidents relying on professional management and technical means.
Online since: October 2011
Authors: Lian Feng Gao, Zhen Guo Zhang, Peng Zhang, Ying Chun Wang, Ying Zhang, Chang Shui Liu
Water resources are abundant.
Surface water is14.62×108km3, and groundwater resources are 13.69× 108km3.
By changing the hydrological characteristics of wetlands, climate change mainly reduced wetland water supply, increased water consumption, so that wetland degraded and shrink.
Recent survey shows that the average annual industrial and domestic waste water are about 2.2×108t in the study area.
Establish a professional protecting lead agency, organize and implement with wetland-related work, coordinate the relationship of wetland protection and regional economic development.
Surface water is14.62×108km3, and groundwater resources are 13.69× 108km3.
By changing the hydrological characteristics of wetlands, climate change mainly reduced wetland water supply, increased water consumption, so that wetland degraded and shrink.
Recent survey shows that the average annual industrial and domestic waste water are about 2.2×108t in the study area.
Establish a professional protecting lead agency, organize and implement with wetland-related work, coordinate the relationship of wetland protection and regional economic development.
Online since: October 2013
Authors: Xiao Dong Li, Wan Cai Xu, Zhou Ya Wang, Cheng Shen
contracting level
Technical risks
Specification compliance
29
Engineering risks
30
Material and equipment requirement
31
HSE management
32
Construction program
Internal resources organization
33
Schedule plan
34
Special program
35
Allocation of managers
36
Choice of construction equipment
37
Project division
38
Contract risks
Letter of guarantee
39
Delay responsibility
40
The owner’s termination or assignment responsibility
41
Price adjustment
42
Payment conditions
43
Risk sharing
44
Variation procedure
45
Claim procedure
46
Settlement of dispute
47
Acceptance and transfer of the project
48
Offering risks
Scope of offering price
49
Price risks
50
Budget omissions
51
Financial risks
Tax risks
52
Financial guarantee
53
Exchange implementation
Table1(c) Risk factors of international EPC projects
No
Risk sources
Risk type
Risk factors
54
other project participant level
Owner
Credit of the owner
55
Owner’s financial capital level
56
Agent
Agent risks
57
Consultant/
Supervisor/
PM company
Professional
standards 58 Professional ethics 59 Division of culture 60 Joint venture partner Credit risks 61 Implementation risks 62 Subcontractor Credit risks 63 Implementation risks 64 Management and control risks market level risks, contracting level risks and other project participant level and the subordinate 16 groups.
Since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 30 feedbacks are sufficient.
Just as stated above, since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 20 feedbacks are sufficient as well.
For example, subgrade construction is to be carried out at the same time with water drainage and safeguard construction, so that when the rainy season comes, the roadway is protected effectively.
standards 58 Professional ethics 59 Division of culture 60 Joint venture partner Credit risks 61 Implementation risks 62 Subcontractor Credit risks 63 Implementation risks 64 Management and control risks market level risks, contracting level risks and other project participant level and the subordinate 16 groups.
Since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 30 feedbacks are sufficient.
Just as stated above, since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 20 feedbacks are sufficient as well.
For example, subgrade construction is to be carried out at the same time with water drainage and safeguard construction, so that when the rainy season comes, the roadway is protected effectively.
Online since: April 2013
Authors: Jian Liu, Sheng Feng Zhu
With the significant discoveries of China National Offshore Oil Corporation (CNOOC) in offshore oil and gas storage, from the Bohai Sea, the East China Sea to the South China Sea, platform bristling with derricks, longer extension of the undersea oil and gas pipeline, high density of marine engineering equipment and a large number of in and out ships place the operating water under the high risk threat of oil spills.
Bohai Oil Spill Remote Sensing Professional System NSOAS Commissioning in 1/1 2007.
Only KSAT, VIGISAT and Bohai oil spill remote sensing professional system can be defined as professional detective system in the chart as shown.
(14) Providing the professional determine the oil spill, the determination result as the feedback information of the recognition algorithm
Bohai Oil Spill Remote Sensing Professional System NSOAS Commissioning in 1/1 2007.
Only KSAT, VIGISAT and Bohai oil spill remote sensing professional system can be defined as professional detective system in the chart as shown.
(14) Providing the professional determine the oil spill, the determination result as the feedback information of the recognition algorithm
Online since: July 2011
Authors: Bin Miao
Preliminary Study about Optimal Allocation of Human Resources Management
Miao Bin1,a
1School of Economics and Management, North China University of Water Resources and Electric Power, Zhengzhou, Henan, China
amiaob2002@sohu.com
Key words: Nanyang mobile company, human resource, optimal allocation
Abstract.
Through the employee relations, company culture dissemination methods, the company can have a common development goals and thought foundation with employees, and through the design of professional development, makes staff understand development way.
The core of constraint mechanism is the evaluation indicator system of company and the professional behavior evaluation qualifications system.
Through the employee relations, company culture dissemination methods, the company can have a common development goals and thought foundation with employees, and through the design of professional development, makes staff understand development way.
The core of constraint mechanism is the evaluation indicator system of company and the professional behavior evaluation qualifications system.
Online since: August 2014
Authors: Wen Jin Xu
Specialized investment promotion expenses determined depending on the specific program.[7]
Modification ( maintenance ) costs is best planned in the planning stage , try not to non-structural changes, just update the news.[4] In addition, there is the best Steering modify , or is likely to change more worse, real simple replacement part of the data Also , you need to put as all electronic and written information provided to the curator.[8]
Conclusion
The site built, an effect , put some context ( not high ) , the key planners levels and professional ethics , if the network services company designated planner, then look at providing services to the company's business ethics .
This paper is supported by the Teaching and Research Project of Professional English Effectiveness Study of Coherent Curriculum Teaching in Communication Major by College of Information Science & Technology Qingdao University of Science & Technology.
[6] LIN Jicheng (The Math.and Computer Dept.of Anqing Teachers College,Anqing 246011,China);Web Component and Dynamic Data Publishing[J];Journal of Anqing Teachers College(Natural Science Edition);2002-04 [7] QI Xiao-xia1,WANG Qi-jin2,HOU Zheng-feng1(1.Computer and Information Institute of Hefei University of Technology,Anhui Hefei 230009,China;2.Anhui Xinhua University,Anhui Hefei 230088,China);Inquiry and Supervisory System of Water and Electricity Fees Based on PHP[J];Computer Knowledge and Technology;2009-10 [8] LIU jun,LI fang(Chengdu university of technology,Sichuan Chengdu 610059);Design and develop of Information system for a state key laboratory[J];CD Technology;2008-09
This paper is supported by the Teaching and Research Project of Professional English Effectiveness Study of Coherent Curriculum Teaching in Communication Major by College of Information Science & Technology Qingdao University of Science & Technology.
[6] LIN Jicheng (The Math.and Computer Dept.of Anqing Teachers College,Anqing 246011,China);Web Component and Dynamic Data Publishing[J];Journal of Anqing Teachers College(Natural Science Edition);2002-04 [7] QI Xiao-xia1,WANG Qi-jin2,HOU Zheng-feng1(1.Computer and Information Institute of Hefei University of Technology,Anhui Hefei 230009,China;2.Anhui Xinhua University,Anhui Hefei 230088,China);Inquiry and Supervisory System of Water and Electricity Fees Based on PHP[J];Computer Knowledge and Technology;2009-10 [8] LIU jun,LI fang(Chengdu university of technology,Sichuan Chengdu 610059);Design and develop of Information system for a state key laboratory[J];CD Technology;2008-09
Online since: December 2013
Authors: Hui Min Li, Fang Qiang Yin
Beijing 798 Art Zone, comprising contemporary art, architecture, cultural and historical context and urban living environment, has strong appeal to all kinds of professionals and the general public, it also has become a tourist resort and art exchange area
The original road, water and electricity network have not meet the current requirements[2]
The original road, water and electricity network have not meet the current requirements[2]
Online since: February 2014
Authors: Yan Hong Guo
Such as whether have the danger tree network, tunnel branches, have crossing the line or the lapped electric power communication line contact the nect, whether tunnel have the situation that freezing leakage water contact ground and whether the trip is due to the outside people break the insulator.
For the power supply section, it should be equipped with fault calibration professionals to understand and master the impedance variation of section line.
For the power supply section, it should be equipped with fault calibration professionals to understand and master the impedance variation of section line.
Online since: July 2014
Authors: Chun Yan Lu
From the overall situation, the current situation of our country’s labor force is that one is more and the other one is shortage, that is to say the total supply of labor force is more than demand, while the supply of the one who is engaged in professional and technical research and the engineering type is less than the demand [2].
Meanwhile, we should make reasonable career planning according to own situation, and should start from current to make good use of the college time to study the scientific cultural knowledge, improve professional skills, enrich and perfect themselves, and to improve their comprehensive competitive strength.
Research of soil and water conservation information system of Dawei Mountain based on the Google Earth.
Meanwhile, we should make reasonable career planning according to own situation, and should start from current to make good use of the college time to study the scientific cultural knowledge, improve professional skills, enrich and perfect themselves, and to improve their comprehensive competitive strength.
Research of soil and water conservation information system of Dawei Mountain based on the Google Earth.