Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: December 2014
Authors: Su Jin Woo, Eun Kyoung Hwang
            
                In 1974, the Fire Code was introduced for the first time, and it has been continually revised in collaboration with legal professionals as well as fire safety and construction experts to reflect the needs of the country’s building and construction industry,which change periodically.
After the establishment of the Fire Service Act in 1975, the building evacuation provisions were strengthened with the enactment of the Building Act in 1992, and an integrated building code that covers aspects such as structural stability, fire safety, access, water resource management, durability, service, and facilities was established by the Building Regulation in 2004.
            
    After the establishment of the Fire Service Act in 1975, the building evacuation provisions were strengthened with the enactment of the Building Act in 1992, and an integrated building code that covers aspects such as structural stability, fire safety, access, water resource management, durability, service, and facilities was established by the Building Regulation in 2004.
Online since: June 2012
Authors: Tian Hong Pu, Hong Sheng Gu, Ya Bin Lou
            
                But, as the professional designers, we all know it needs comprehensive consideration how to select the development tool and environment.
The pipelines of graphics data of the coal gas and tap water is stored in the space table of the database, its relevant association is established through the respective numbers of pipe lines and property data and the project management data stored in the database.
Application of GIS and MapInfo [M].Beijing: Science Press,1999 [4]Evangelos Petroutsos.Visual Basic 5: From Novice to Professional [M].
            
    The pipelines of graphics data of the coal gas and tap water is stored in the space table of the database, its relevant association is established through the respective numbers of pipe lines and property data and the project management data stored in the database.
Application of GIS and MapInfo [M].Beijing: Science Press,1999 [4]Evangelos Petroutsos.Visual Basic 5: From Novice to Professional [M].
Online since: July 2014
Authors: Su Ning Xu, Xue Jiao Tian, Fan Di Meng
            
                the demand for the environment on health
The relationship between nature and medical is discussed by Hippocrates in a chapter of his famous work ‘air, water and place’.
Comprehensive practice activity room and theater can help the patient to communicate with each other and have entertainment. ancillary service set up catering, store, library, kiosks, flower shop for patients, visitors, and medical professionals giving the user an environment the same as outside.
            
    Comprehensive practice activity room and theater can help the patient to communicate with each other and have entertainment. ancillary service set up catering, store, library, kiosks, flower shop for patients, visitors, and medical professionals giving the user an environment the same as outside.
Online since: October 2013
Authors: Xiao Dong Li, Wan Cai Xu, Zhou Ya Wang, Cheng Shen
            
                contracting level
Technical risks
Specification compliance
29
Engineering risks
30
Material and equipment requirement
31
HSE management
32
Construction program
Internal resources organization
33
Schedule plan
34
Special program
35
Allocation of managers
36
Choice of construction equipment
37
Project division
38
Contract risks
Letter of guarantee
39
Delay responsibility
40
The owner’s termination or assignment responsibility
41
Price adjustment
42
Payment conditions
43
Risk sharing
44
Variation procedure
45
Claim procedure
46
Settlement of dispute
47
Acceptance and transfer of the project
48
Offering risks
Scope of offering price
49
Price risks
50
Budget omissions
51
Financial risks
Tax risks
52
Financial guarantee
53
Exchange implementation
Table1(c) Risk factors of international EPC projects
No
Risk sources
Risk type
Risk factors
54
other project participant level
Owner
Credit of the owner
55
Owner’s financial capital level
56
Agent
Agent risks
57
Consultant/
Supervisor/
PM company
Professional
standards 58 Professional ethics 59 Division of culture 60 Joint venture partner Credit risks 61 Implementation risks 62 Subcontractor Credit risks 63 Implementation risks 64 Management and control risks market level risks, contracting level risks and other project participant level and the subordinate 16 groups.
Since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 30 feedbacks are sufficient.
Just as stated above, since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 20 feedbacks are sufficient as well.
For example, subgrade construction is to be carried out at the same time with water drainage and safeguard construction, so that when the rainy season comes, the roadway is protected effectively.
            
    standards 58 Professional ethics 59 Division of culture 60 Joint venture partner Credit risks 61 Implementation risks 62 Subcontractor Credit risks 63 Implementation risks 64 Management and control risks market level risks, contracting level risks and other project participant level and the subordinate 16 groups.
Since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 30 feedbacks are sufficient.
Just as stated above, since it’s not a general survey as common but relies on the judgment of expert with years of professional practice, 20 feedbacks are sufficient as well.
For example, subgrade construction is to be carried out at the same time with water drainage and safeguard construction, so that when the rainy season comes, the roadway is protected effectively.
Online since: April 2013
Authors: Jian Liu, Sheng Feng Zhu
            
                With the significant discoveries of China National Offshore Oil Corporation (CNOOC) in offshore oil and gas storage, from the Bohai Sea, the East China Sea to the South China Sea, platform bristling with derricks, longer extension of the undersea oil and gas pipeline, high density of marine engineering equipment and a large number of in and out ships place the operating water under the high risk threat of oil spills.
Bohai Oil Spill Remote Sensing Professional System NSOAS Commissioning in 1/1 2007.
Only KSAT, VIGISAT and Bohai oil spill remote sensing professional system can be defined as professional detective system in the chart as shown.
(14) Providing the professional determine the oil spill, the determination result as the feedback information of the recognition algorithm
            
    Bohai Oil Spill Remote Sensing Professional System NSOAS Commissioning in 1/1 2007.
Only KSAT, VIGISAT and Bohai oil spill remote sensing professional system can be defined as professional detective system in the chart as shown.
(14) Providing the professional determine the oil spill, the determination result as the feedback information of the recognition algorithm
Online since: November 2013
Authors: Yong Gang Li, Hong Jiang, Xing Ru Zhang, Xiao Wang
            
                Mahai salt lake has disadvantages of water shortage and low grade KCl (KCl<8% wt/wt)).
But even though the reserve of KCl is rich, the grade of KCl mine is low and water shortage.
(3) The pressure function use water head.
The upper hole was put water head of 2m, 1m and 0.5 m separately.
Erie : Petrophysics: Theory and Practice of Measuring Reservoir Rock and Fluid Transport Properties (Gulf Professional Publishing, Oxford 2004) [8] Liang Guoping.
            
    But even though the reserve of KCl is rich, the grade of KCl mine is low and water shortage.
(3) The pressure function use water head.
The upper hole was put water head of 2m, 1m and 0.5 m separately.
Erie : Petrophysics: Theory and Practice of Measuring Reservoir Rock and Fluid Transport Properties (Gulf Professional Publishing, Oxford 2004) [8] Liang Guoping.
Online since: March 2013
Authors: Xiao Mian Liu, Xin Yu Guo, Hai Lin Cong, Jin Shan Tan, Ze Jing Li, Yun Chao Zhao, Yi Chen Lian, Bing Yu
            
                Introduction
Using hollow fiber ultrafiltration membrane for water treatment is one of the most mature and advanced technologies [1-4].
The velocity of the spinning solution and the water in middle were both fixed at 500ml/h.
Hughes, Industry membrane separation technology, Blackie Academic and Professional: Glasgow (1996)
Nicolaisen, Developments in membrane technology for water treatment, Desalination 153 (2002) 355-360
Huck, Modification of poly(vinylidene fluoride) ultrafiltration membranes with poly(viny alcohol) for fouling control in drinking water treatment, Water Research. 43 (2009) 4559-4568
            
    The velocity of the spinning solution and the water in middle were both fixed at 500ml/h.
Hughes, Industry membrane separation technology, Blackie Academic and Professional: Glasgow (1996)
Nicolaisen, Developments in membrane technology for water treatment, Desalination 153 (2002) 355-360
Huck, Modification of poly(vinylidene fluoride) ultrafiltration membranes with poly(viny alcohol) for fouling control in drinking water treatment, Water Research. 43 (2009) 4559-4568
Online since: September 2013
Authors: Chun Ming Zhang, Yong Ye Liu, Ya Hua Qiao, Bo Wang, Yang Yang, Fu Dong Liu
            
                Inland npps taking water from and discharging to rivers or lakes are different from coastal npps.
Simulation conditions include two aspects: (1) different unit capacity: 2×1000MW and 4×1000MW; (2) different quantity of water intake and water discharge because of different seasons (summer and winter), as same as temperature rise.
Fig.5 2 Units in summer Fig.6 2 Units in winter Fig.7 4 Units in summer Fig.8 4 Units in winter Conclusions As the professional software officially approved by United States for water quality simulation, CORMIX expert system is widely used and has certain advantages in 3-d simulation of near field.
References [1] Shaowei Wang, Huiguo Yue, Wenbin Xiong, et al: South-to-North Water Transfers and Water Science & Technology 2012, 10(3), p. 114 (In Chinese) [2] Tonghan Zheng, Qingwei Chen: China Water Resources 2011, 21, p. 24 (In Chinese) [3] Yongye Liu, Yang Yang, Fudong Liu: Radiat.
Meeting material (2012) (In Chinese) [5] Chunbo Jiang, Lihui Du: Advances in Water Science, 2000, 11(4), p. 351-352 (In Chinese) [6] Hanzhu Lu, An Luo, Bo Fu: Guangdong Water Resour.
            
    Simulation conditions include two aspects: (1) different unit capacity: 2×1000MW and 4×1000MW; (2) different quantity of water intake and water discharge because of different seasons (summer and winter), as same as temperature rise.
Fig.5 2 Units in summer Fig.6 2 Units in winter Fig.7 4 Units in summer Fig.8 4 Units in winter Conclusions As the professional software officially approved by United States for water quality simulation, CORMIX expert system is widely used and has certain advantages in 3-d simulation of near field.
References [1] Shaowei Wang, Huiguo Yue, Wenbin Xiong, et al: South-to-North Water Transfers and Water Science & Technology 2012, 10(3), p. 114 (In Chinese) [2] Tonghan Zheng, Qingwei Chen: China Water Resources 2011, 21, p. 24 (In Chinese) [3] Yongye Liu, Yang Yang, Fudong Liu: Radiat.
Meeting material (2012) (In Chinese) [5] Chunbo Jiang, Lihui Du: Advances in Water Science, 2000, 11(4), p. 351-352 (In Chinese) [6] Hanzhu Lu, An Luo, Bo Fu: Guangdong Water Resour.
Online since: August 2014
Authors: Lu Ma, Peng Fei Wang, Shu Jiang, Lin Lin Cheng, Jun Tao Ren
            
                According to statistics, pressure coal amounted to 1.3764×1010 tons under buildings, railways and water bodies, of which coal under buildings accounts for 50%, while 66% of the buildings on coal under the village [3].
Although coal village relocation involves land acquisition, land planning, land reclamation, and many other land issues, the study from scholars on the research of land boundary is slim, and there is no Doctor and Master of land professional writing the dissertation.
Zhang Wentao combined with a specific mining area to study ultra-high water filling mining technology, and to describe the specific process [18-19].
[5] Li G L: The international association of mine surveying, chairman of the secretariat, mine surveying association of professional committee of the sixth international. 2006.
[37] Y L N,Zh Ch J,L J H: China Mine surveying professional committee of coal society. 2010.04
            
    Although coal village relocation involves land acquisition, land planning, land reclamation, and many other land issues, the study from scholars on the research of land boundary is slim, and there is no Doctor and Master of land professional writing the dissertation.
Zhang Wentao combined with a specific mining area to study ultra-high water filling mining technology, and to describe the specific process [18-19].
[5] Li G L: The international association of mine surveying, chairman of the secretariat, mine surveying association of professional committee of the sixth international. 2006.
[37] Y L N,Zh Ch J,L J H: China Mine surveying professional committee of coal society. 2010.04
Online since: July 2011
Authors: Bin Miao
            
                Preliminary Study about Optimal Allocation of Human Resources Management
Miao Bin1,a
1School of Economics and Management, North China University of Water Resources and Electric Power, Zhengzhou, Henan, China
amiaob2002@sohu.com
Key words: Nanyang mobile company, human resource, optimal allocation
Abstract.
Through the employee relations, company culture dissemination methods, the company can have a common development goals and thought foundation with employees, and through the design of professional development, makes staff understand development way.
The core of constraint mechanism is the evaluation indicator system of company and the professional behavior evaluation qualifications system.
            
    Through the employee relations, company culture dissemination methods, the company can have a common development goals and thought foundation with employees, and through the design of professional development, makes staff understand development way.
The core of constraint mechanism is the evaluation indicator system of company and the professional behavior evaluation qualifications system.