Search Options

Sort by:

Sort search results by

Publication Type:

Publication Type filter

Open access:

Publication Date:

Periodicals:

Periodicals filter

Search results

Online since: October 2013
Authors: Xiao Xiao Qi, Yun Long Sun
Low-carbon industries, such as solar energy industry, wind and tidal energy industry, water hydrogen energy industry, nuclear industry, and bio-energy industry, are urgently needed industries or industry clusters for low-carbon economic development.
Professional and vocational ability is the necessary skill engaged in a particular socio-professional, and the basic means of livelihood to survive and seek development.
Only possessing a certain professional and vocational ability, can we take part in social practice activity.
Fourth, entrepreneurial knowledge includes professional and vocational, management and comprehensive knowledge.
Professional and vocational knowledge is generally combined with professional ability to play a role.
Online since: August 2013
Authors: Zhi Rong Zheng, Shi Hai Lv, Jun Jing Gao, Chao Yang Feng
In addition, only 6 staffs had related professional background, which meant that less than 2 professional personnel need to manage 100,000 hectares.
The results showed that the percentage of degraded habitat area amounted to 6.96%, including 7491.6 hm2 degraded grassland, 13404.7hm2degraded wetland, and 3.4 hm2 degraded woodland and 2247.2 hm2 degraded water area (fig.4).
However, lack of professional staffs and funds resulted in the poor management behavior.
Increase the number of technology professionals.
To decrease the occurrences of abusing cut, poaching, illegal digging herbs, et al., not only technology professionals should be increased but also patrol and supervision should be strengthened.
Online since: November 2014
Authors: Zuzana Pešková
The large-scale project was assigned to a team of professionals (teachers and graduates of the Faculty of Civil Engineering of the Czech Technical University in Prague), led by Professor Sykora.
The large-scale project was assigned to a team of professionals (teachers and graduates of the Faculty of Civil Engineering of the Czech Technical University in Prague), led by Professor Sykora.
The construction is founded above the water table.
This mattress prevents the impoundment of water behind the wall.
This mattress prevents water leakage behind the wall.
Online since: May 2014
Authors: Hui Feng, Zi Jing Pan
Introduction Water quality monitoring plays a key role in water resource management and protection.
The sensor nodes are deployed in the water field to collect and process the information of water quality parameters, such as water temperature, PH value, DO, turbidity of water.
In the sensor node, we measurement three water quality parameters: PH value, DO, turbidity of water.
We use the WQ series of sensor from GLOBAL WATER Inc, which is professional to manufacture water quality sensors.
The water quality sensors may convert water quality parameters of physical and chemical volume to electrical signals, the signal may be voltage signal or current signal.
Online since: December 2012
Authors: Ling Yu
Planning Method Planning full consideration of Suzhou region characteristic, combined with Suzhou hold lake waters of the natural environment factors, outstanding water, vegetation of ecological elements regional environment of the important role.
Take the landscape of the water quality of the ecological management, coast and road the ecological design as the means, overall improve water environment.
Advocate open rules row, much professional coordination and the whole through the design of open mode and organized way and will rules row, architecture, ecological [11], ring its territory, the professional landscape member of various professional to provide for handle effectively the and group close, through several different subject, form for “ecological” this altogether with the target to the planning and design of the power.
Vertical structure more mainly reflects in wetland plant community perpendicular arranges, in the water, from shallow water and sank vegetation and vegetation floating a water vegetation riverbeds, wetland and wetland thickets, wetland meadow arbor, form a in the vertical space of the ecological sequence.
In addition in the west more visitors area, coast the rugged, will lead to the shore reed marshland serves, people can through the laid deep water plank road reed marshland serves, realize natural habitat, and overlooking 5000 the main body of waters.
Online since: October 2013
Authors: Hong Li, Yun Ting Sun
Retaining wall, if its water filtering layer or drainage hole does not design according to the requirements in construction drawing, will induces crack and inclination under the combined action of groundwater pressure and earth pressure.
Most of all, a great many contract workers, casual workers and some technicians without professional title, because of lack specialized knowledge, basic professional skill, and relative vocational training, lead the construction quality accident occurred.
On one hand, supervisor lacking specialized knowledge and basic professional skill, to be conscious of none when the accident occurred, is the greatness of all faults.
Our country should carry out and implement “Construction Law of PRC" and “Regulations on Quality Control of Construction Projects” and promote the study of regulations and standards, in order to enhance the awareness of engineering designers, to heighten their professional skill, to establish the idea of “quality is priority”.
Strengthen Professional Skill of Constructer and Supervisor.
Online since: October 2014
Authors: An Na Shi, Su Juan Ge
Meanwhile, the hydropower projects in the implementation process involves professional and more, using many domestic and foreign high technology, high degree of automation, vertical, horizontal convergence closely cooperate with each other mutual restraint among professional also.
Correspondingly, related to the construction and installation of many construction professionals, resulting in co-operation with the quality of each scene big difference.
The insurance market in China has been a professional hydropower insurance companies and insurance brokers, water and electricity industry.
Cambodia Gump hydropower project has the natural conditions of insufficient water again.
By the choice experienced qualified partners, have the project risk management professionals to do detailed site organization and relevant plans.
Online since: December 2014
Authors: Ming Qing You
Integration of Environmental Education and Research for Multi-Disciplinary Studies Mingqing You Zhongnan University of Economics and Law, Hubei Water Affairs Research Center Wuhan, 430074, China hahamq@163.com Keywords: environmental education; environmental research; integration; multi-disciplinary environmental studies Abstract.
Nevertheless, future professionals in any one of these fields need to have a basic understanding of other fields in addition to a thorough understanding of his particular field of study.
This basic understanding will enable professionals of each field to meaningfully communicate with professionals of other fields.
Online since: November 2012
Authors: Ming Liang, Si Cheng, Yun Sheng Wang
Ma Anping Landslide and Yuan Yangsi Landslide are selected to build professional monitoring sites.
The research team collects records of rainfall, surface displacement, deep displacement, groundwater level, pressure of pore water, water ratio, and soil pressure.
Furthermore, ZK1 sensor is in lower part of the landslide, and its record is relatively stable due to inferior water containing ability and water drainage ability of this part.
Groundwater level, water ratio, water pressure, surface displacement, deep displacement, and other parameters are recorded.
Jiang Xi Water Conservancy Technology Vol. 6(2008), P. 13-15
Online since: November 2015
Authors: Ladislav Morovič, Ján Milde
The 3D digitizing was performed by 3D scanner GOM ATOS II SO TripleScan; GOM ATOS Professional v7.5 SR2 software was used for processing of the scanned data and Delcam PowerSHAPE 2015 CAD software was used for reverse modeling.
Data Processing The obtained data (point cloud) was processed by GOM ATOS Professional v7.5 SR2 software.
Color Deviation Map Fig. 7 shows the color map of deviations, where the CAD model of the screw propeller created in the software Delcam PowerSHAPE 2015 (.IGES format) is compared to polygonal model (.STL format) obtained by 3D scanner GOM ATOS II SO TripleScan MV100 modified in the software GOM ATOS Professional v7.5 SR2.
After importing both file formats (.IGES and .STL a) into software GOM ATOS Professional v7.5 SR2, the alignment of models is carried out.
Miron: Research on Abrasive Water Jet Milling of the Planar Surfaces, Slots and Profiles.
Showing 321 to 330 of 3745 items