Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: May 2012
Authors: Ying Na Dong, Su Hua Yin
A professional person response for supervision and inspection of steel columns weld quality.
All welded steel columns must be tested by the professional testing department.
It can pour water to the steel tube directly on Concrete curing time.
Generally first pour 10 cm of conservation of water, the next day to check whether conservation water is needed.
In principle, it is appropriate to ensure 1 cm of water covered on the concrete surface.
All welded steel columns must be tested by the professional testing department.
It can pour water to the steel tube directly on Concrete curing time.
Generally first pour 10 cm of conservation of water, the next day to check whether conservation water is needed.
In principle, it is appropriate to ensure 1 cm of water covered on the concrete surface.
Online since: October 2011
Authors: Xuan Li, Jing Wang, Ying Ying Shen, Chen Jie Liu, Bao Na Wu, Qian Yu Chen
Without the help of professional rescue facilities, people can only rescue by hands or by simple tool, which helps little in rescuing people buried under earth or stuck in high buildings.
After simple packs, part of the injured should be sent to hospitals to take professional treatment or even operations.
In Wenchuan earthquake, due to bad road condition, professional medical care could not reach the disaster-stricken area; many people relied on simple wood-made stretchers to get out of the mountains.
In our country, professionals define it as public facility and urban environmental facility.
To take the design of dustbin for example, a dustbin should firstly satisfy the function of contain garbage and then, the design should be water-proof incase the dustbin contains water in rainy days.
After simple packs, part of the injured should be sent to hospitals to take professional treatment or even operations.
In Wenchuan earthquake, due to bad road condition, professional medical care could not reach the disaster-stricken area; many people relied on simple wood-made stretchers to get out of the mountains.
In our country, professionals define it as public facility and urban environmental facility.
To take the design of dustbin for example, a dustbin should firstly satisfy the function of contain garbage and then, the design should be water-proof incase the dustbin contains water in rainy days.
Online since: September 2013
Authors: Hong Jiang Wu, Xin Kui Li, Hai Yan Zhao
The ultimate goal of cloud computing is to provide all the users with computing as a public facility so that they can use computer resources as conveniently as they do with water, electricity gas and telephone.
With the help of the assisting service provided by the team of professionals, it analyses, diagnoses, predicts, tracks, assesses and decides on the data by utilizing the cloud platform’s powerful storing, computing and logic ability, and eventually provides the trainers with a set of specialized sports training program.
The sports training metadata are extracted from the core concepts of the human science and sports training knowledge accumulated by the training teams of professionals.
Collaborative Services by Teams of Professionals.The development of cloud computing technology can link people and data closely, ensure communication and collaboration in every application, and truly reach the goal of collaborating without boundaries.
Secondly, the establishment of virtual teams of professionals solves the problem of cross-regional cooperation between teams, and provides the conditions for making the best use of collective wisdom.
With the help of the assisting service provided by the team of professionals, it analyses, diagnoses, predicts, tracks, assesses and decides on the data by utilizing the cloud platform’s powerful storing, computing and logic ability, and eventually provides the trainers with a set of specialized sports training program.
The sports training metadata are extracted from the core concepts of the human science and sports training knowledge accumulated by the training teams of professionals.
Collaborative Services by Teams of Professionals.The development of cloud computing technology can link people and data closely, ensure communication and collaboration in every application, and truly reach the goal of collaborating without boundaries.
Secondly, the establishment of virtual teams of professionals solves the problem of cross-regional cooperation between teams, and provides the conditions for making the best use of collective wisdom.
Online since: November 2012
Authors: Ming Liang, Si Cheng, Yun Sheng Wang
Ma Anping Landslide and Yuan Yangsi Landslide are selected to build professional monitoring sites.
The research team collects records of rainfall, surface displacement, deep displacement, groundwater level, pressure of pore water, water ratio, and soil pressure.
Furthermore, ZK1 sensor is in lower part of the landslide, and its record is relatively stable due to inferior water containing ability and water drainage ability of this part.
Groundwater level, water ratio, water pressure, surface displacement, deep displacement, and other parameters are recorded.
Jiang Xi Water Conservancy Technology Vol. 6(2008), P. 13-15
The research team collects records of rainfall, surface displacement, deep displacement, groundwater level, pressure of pore water, water ratio, and soil pressure.
Furthermore, ZK1 sensor is in lower part of the landslide, and its record is relatively stable due to inferior water containing ability and water drainage ability of this part.
Groundwater level, water ratio, water pressure, surface displacement, deep displacement, and other parameters are recorded.
Jiang Xi Water Conservancy Technology Vol. 6(2008), P. 13-15
Online since: October 2014
Authors: Xiao Ming Yang, Xuan Su
The school hoped to cultivate a group of professionals with theory knowledge and practical ability to improve the quality and quantity of local silkworm.
The targets of both departments were to cultivate more relative professionals.
In the third year, the students of two departments had the different professional courses and internships.
The proportion of the professional curriculums of silk education improved.
It developed from having only two professional courses to an independent department.
The targets of both departments were to cultivate more relative professionals.
In the third year, the students of two departments had the different professional courses and internships.
The proportion of the professional curriculums of silk education improved.
It developed from having only two professional courses to an independent department.
Online since: March 2015
Therefore, the International
Conference on Civil Engineering and Transportation is aspired to promote construction practices
and create awareness among different industry professionals.
And the main aim of this conference is to bring together academics and other professionals from all over the world, for the presentation and exchange of their thoughts and experiences on concepts, trends and practices in civil engineering and advanced transportation fields.
This volume comprised the selected papers from the subject areas of Structural Engineering; Geotechnical Engineering and Geological Engineering; Bridge Engineering; Earthquake Engineering; Tunnel, Subway and Underground Facilities; Hydraulic Engineering, Water Supply and Drainage Engineering; Coastal Engineering; Surveying Engineering, Cartography and Geographic Information Systems; Ecological Architecture and Energy Consumption, Energy Saving, Heating, Gas Supply, Ventilation and Air Conditioning Works; Disaster Prevention and Mitigation Engineering; Computational Mechanics and Mathematical Modeling; Construction Project Planning and Monitoring; Roads, Railway Engineering and Landscape Design; Transportation Planning, Construction and Operation Organization; Modern Logistics Systems and Supply Chain; Automotive Engineering and Other Vehicle Tools; Intelligent Transportation Theory and Application; Transportation Control and Information Technology; Transportation and
And the main aim of this conference is to bring together academics and other professionals from all over the world, for the presentation and exchange of their thoughts and experiences on concepts, trends and practices in civil engineering and advanced transportation fields.
This volume comprised the selected papers from the subject areas of Structural Engineering; Geotechnical Engineering and Geological Engineering; Bridge Engineering; Earthquake Engineering; Tunnel, Subway and Underground Facilities; Hydraulic Engineering, Water Supply and Drainage Engineering; Coastal Engineering; Surveying Engineering, Cartography and Geographic Information Systems; Ecological Architecture and Energy Consumption, Energy Saving, Heating, Gas Supply, Ventilation and Air Conditioning Works; Disaster Prevention and Mitigation Engineering; Computational Mechanics and Mathematical Modeling; Construction Project Planning and Monitoring; Roads, Railway Engineering and Landscape Design; Transportation Planning, Construction and Operation Organization; Modern Logistics Systems and Supply Chain; Automotive Engineering and Other Vehicle Tools; Intelligent Transportation Theory and Application; Transportation Control and Information Technology; Transportation and
Online since: October 2014
Authors: An Na Shi, Su Juan Ge
Meanwhile, the hydropower projects in the implementation process involves professional and more, using many domestic and foreign high technology, high degree of automation, vertical, horizontal convergence closely cooperate with each other mutual restraint among professional also.
Correspondingly, related to the construction and installation of many construction professionals, resulting in co-operation with the quality of each scene big difference.
The insurance market in China has been a professional hydropower insurance companies and insurance brokers, water and electricity industry.
Cambodia Gump hydropower project has the natural conditions of insufficient water again.
By the choice experienced qualified partners, have the project risk management professionals to do detailed site organization and relevant plans.
Correspondingly, related to the construction and installation of many construction professionals, resulting in co-operation with the quality of each scene big difference.
The insurance market in China has been a professional hydropower insurance companies and insurance brokers, water and electricity industry.
Cambodia Gump hydropower project has the natural conditions of insufficient water again.
By the choice experienced qualified partners, have the project risk management professionals to do detailed site organization and relevant plans.
Online since: February 2014
Authors: Jian Gang Tang
In recent years many universities have set up computer simulation courses, because these courses was opened in a short time, they names and contents is not uniform, generally attributed to electronic information, subclasses belonging to different professions, such as automation, electronic information professionals, measurement control and communications professionals and other professionals.
Therefore, in some relevant professional colleges had been designed simulation system for some courses, such as: electrical and electronic simulation, chemical simulation experiments, computer simulations will be applied to the experimental teaching curriculum, so that combining simulation and real experiments conducted from to better results[3]. 2.
Since computer simulations and real experiments are required to have a high degree of fidelity and consistency, which requires simulation software professional staffing with the corresponding experimental work closely with teachers, software and staffing to fully grasp skilled experimental operation, so that to design a valuable simulation software. 4.1 The simulation system design need manpower and time guarantee The experimental teachers and related personnel should be trained and practiced to improve computer skills and experimental operation level.
The design of computer simulation software Different areas have different professional simulation software, the design and application characteristics of each simulation systems are also different.
Electrical and electronic professionals can design signal amplifier, waveform generators, counters and other functional circuit simulation unit.
Therefore, in some relevant professional colleges had been designed simulation system for some courses, such as: electrical and electronic simulation, chemical simulation experiments, computer simulations will be applied to the experimental teaching curriculum, so that combining simulation and real experiments conducted from to better results[3]. 2.
Since computer simulations and real experiments are required to have a high degree of fidelity and consistency, which requires simulation software professional staffing with the corresponding experimental work closely with teachers, software and staffing to fully grasp skilled experimental operation, so that to design a valuable simulation software. 4.1 The simulation system design need manpower and time guarantee The experimental teachers and related personnel should be trained and practiced to improve computer skills and experimental operation level.
The design of computer simulation software Different areas have different professional simulation software, the design and application characteristics of each simulation systems are also different.
Electrical and electronic professionals can design signal amplifier, waveform generators, counters and other functional circuit simulation unit.
Online since: July 2014
Authors: Ya Lan Liu, Huan Wei, Ze Zhong Zheng, Tian He Chi, Ling Peng, Lin Jun Yu
About the next step , Meng Jianzhu proposed “it needs to further enhance fire professional team construction and to build a sound fire emergency rescue command platform and social linkage mechanism, to improve rescue emergency plan , to strengthen the special fire-fighting and tactical research and professional training, and to enhance the combat effectiveness of the fire emergency rescue”.
2 Progress on fire emergency plan
There are two kinds of fire emergency plans.
Through the 3D way can we make swift and right decision to find out the road, water source, distribution of buildings and escape routes in the rescue scene [5].
Digital plans are usually made by digital multimedia technology, which is strong technical that non-professionals generally find it difficult to make independence, and expensive that usually cost thousands or ten thousands RMB
Adding 3D structures of the building’s external environment and indoor electronic map, can achieve the finding and positioning of outdoor fire vehicles, fire water, etc...
Through the 3D way can we make swift and right decision to find out the road, water source, distribution of buildings and escape routes in the rescue scene [5].
Digital plans are usually made by digital multimedia technology, which is strong technical that non-professionals generally find it difficult to make independence, and expensive that usually cost thousands or ten thousands RMB
Adding 3D structures of the building’s external environment and indoor electronic map, can achieve the finding and positioning of outdoor fire vehicles, fire water, etc...
Online since: August 2013
Authors: Ming Long Yuan, Jiang Ping Chang, Hong Li Li, Ying Jie Zhang, Guo Xian Zhou
Water vapor permeability is measured with classic method [8].
Water Vapor Permeability (WVP) measurement The copolymer films were sealed on the top glass permeating cup contain distilled water (100% RH; 2337 Pa vapor pressure at 20℃), which was placed in a desiccator at 20 ℃ and 0% RH containing silica (0 Pa vapor pressure).
Water acts a solvent or carrier and causes texture degradation, and chemical and enzymatic reactions [10].
This result mainly attributed to the carbon chain length of copolymer, the increase in water vapor permeability of polymer mainly duo to the tortuous path for water vapor diffusion, because the shorter carbon chain length increasing the diffusion path length.
Acknowledge This work was financially supported by the National Natural Science Foundation of China (31160198), the Applied Basic Research Project of Yunnan (2011FB084), High-End Technology Professionals Introduction Plan in Yunnan province (2010CI119), the Natural Science Foundation of Yunnan (2010FXW004) and the School of Chemistry and Biotechnology, Yunnan University of Nationalities (11HXYJS02).
Water Vapor Permeability (WVP) measurement The copolymer films were sealed on the top glass permeating cup contain distilled water (100% RH; 2337 Pa vapor pressure at 20℃), which was placed in a desiccator at 20 ℃ and 0% RH containing silica (0 Pa vapor pressure).
Water acts a solvent or carrier and causes texture degradation, and chemical and enzymatic reactions [10].
This result mainly attributed to the carbon chain length of copolymer, the increase in water vapor permeability of polymer mainly duo to the tortuous path for water vapor diffusion, because the shorter carbon chain length increasing the diffusion path length.
Acknowledge This work was financially supported by the National Natural Science Foundation of China (31160198), the Applied Basic Research Project of Yunnan (2011FB084), High-End Technology Professionals Introduction Plan in Yunnan province (2010CI119), the Natural Science Foundation of Yunnan (2010FXW004) and the School of Chemistry and Biotechnology, Yunnan University of Nationalities (11HXYJS02).