Application of a Geohazard Early Warning System in Huaying Mountain Region, Sichuan Province

Article Preview

Abstract:

Geohazards occur in south west mountain area of China each year frequently. Therefore, selecting a typical region to establish a geohazard early warning system and to research the mechanisms of geohazard can greatly improve the ability of geohazard prevention in that mountain area, and then a geohazard early warning system is established at Huaying Mountain region. This article not only presents the construction of that system, but also elaborately analyses mechanism of some geohazards in that mountain region.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 588-589)

Pages:

2009-2012

Citation:

Online since:

November 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhu Bing, Hu Qing, Liao Lirong: Discussion for the construction of flood early warning system in Sichuan County [J]. Jiang Xi Water Conservancy Technology Vol. 6(2008), P. 13-15.

Google Scholar

[2] Wilson J. D: GIS goes global-technology builds management resource [J]. GIS World Vol. 36(1997), P. 46-50.

Google Scholar

[3] Zheng Li, Wu Yueming: Suggestions for developing geological hazard early warning system [J], China Water Conservancy Vol. 7(2007), P. 34-35.

Google Scholar

[4] Paul H. Simms, Ernest K. Yanful: Measurment and estimation of pore shrinkage and pore distribution in a clayey till during soil-water characteristic curve tests [J], Canadian Geotechnical Journal Vol. 38(2001), P. 741-754.

DOI: 10.1139/t01-014

Google Scholar

[5] Pradhan B, Singh R P, Buehrothner M F: Estimation of stress and its use in evaluation of landslide prone regions using remote sensing data [J], Advance in Space Research Vol. 2(2005), P. 21-28.

DOI: 10.1016/j.asr.2005.03.137

Google Scholar

[6] H. Rahardjo, X W Li, E. C. Leong: The effect of antecedent rainfall on slope stability [J], Geotechnical and Geological Engineering Vol. 19 (2001), P. 371-399.

DOI: 10.1007/978-94-015-9775-3_8

Google Scholar