Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: October 2011
Authors: Hai Hong Song, Ling Ling Zhang
Harbin Third Water Supply Plant is situated in the northern part, providing 60% of the municipal water consumed.
Many large professional markets such as Fruit Wholesale Market, Clothing Fabric City, Harbin West Steel Wholesale Market, Agricultural Technology Market, Nuo Mate Supermarket and Xuefu Bookstore have been built in the area.
Many large professional markets such as Fruit Wholesale Market, Clothing Fabric City, Harbin West Steel Wholesale Market, Agricultural Technology Market, Nuo Mate Supermarket and Xuefu Bookstore have been built in the area.
Online since: February 2013
Authors: Qun Chen
There are 40.8 thousand square kilometers of farmland and 10.5 thousand square kilometers of water surface in Anhui province with its mariculture area of 4.8 thousand square kilometers.
Many spezialisierter Haushalts or professional villages specialized in cultivating fungi with crop straw, and the cultivation scale became larger and larger at Fengyang, Fanchang, Guoyang, Jieshou, Huoqiu county in Anhui province.
The main livestock raised in the north of Anhui were cow, water buffalo, and sheep.
Many spezialisierter Haushalts or professional villages specialized in cultivating fungi with crop straw, and the cultivation scale became larger and larger at Fengyang, Fanchang, Guoyang, Jieshou, Huoqiu county in Anhui province.
The main livestock raised in the north of Anhui were cow, water buffalo, and sheep.
Online since: June 2014
Authors: Shu Sheng Hou
Through the creation of advanced courses is such as translation, interpretation and other professional foundation courses, comprehensive training for students of special language application ability.
Like boiling water, fire is not enough; the water will always be burned apart.
Like boiling water, fire is not enough; the water will always be burned apart.
Online since: August 2020
Authors: Ghawsaddin Nazari, Shunya Yamanaka, Shigeyuki Date
Two type of chemical admixture are used, superplasticizer, 8000S, and air entraining agent, BASF 303A.The water-cement ratio was 30%, and the sand-cement ratio was 2.0.
Initially, cement, sand and carbon free fly ash were mixed on a slow speed of mixer for 30 second, subsequently, water, superplasticizer and air entraining agent were added and mixed for 60 second on slow speed as well, and finally again mixed for 30 second on fast speed.
Journal of the Association of Professional engineers and Geoscientist of BC, September 2000 [13] A.
Initially, cement, sand and carbon free fly ash were mixed on a slow speed of mixer for 30 second, subsequently, water, superplasticizer and air entraining agent were added and mixed for 60 second on slow speed as well, and finally again mixed for 30 second on fast speed.
Journal of the Association of Professional engineers and Geoscientist of BC, September 2000 [13] A.
Online since: July 2013
Authors: Yu Zhang, Yu Dong Wang
I made a few improvements program is not conspicuous, and professional construction than appear to be backward.
The bridge site geological unit in which Gang Fu-like plains Lot geotechnical causes of Quaternary ice water to form clay.
See from the construction of the course, Yangming Tan Bridge has gone through several important construction node: In 2009, construction workers winter temperatures below minus 30 ℃, the completion of the main tower 80 piles; From May 2010 to November, the four towers, the main tower cap;6600 tons of steel beams in the following winter, the main bridge in the assembly platform completed bolted assembly and pushing, and worthy of the temporary pier in water solid ice surface, the steel beams from the north side of the push to take advantage of the ice surface of the Songhua River South Bank, the summer prefabricated finished precast beams installed a third.
The bridge site geological unit in which Gang Fu-like plains Lot geotechnical causes of Quaternary ice water to form clay.
See from the construction of the course, Yangming Tan Bridge has gone through several important construction node: In 2009, construction workers winter temperatures below minus 30 ℃, the completion of the main tower 80 piles; From May 2010 to November, the four towers, the main tower cap;6600 tons of steel beams in the following winter, the main bridge in the assembly platform completed bolted assembly and pushing, and worthy of the temporary pier in water solid ice surface, the steel beams from the north side of the push to take advantage of the ice surface of the Songhua River South Bank, the summer prefabricated finished precast beams installed a third.
A Study on Application of Low-Rise Steel Structure Housing in Small Towns of Northern Shan'Xi Region
Online since: June 2014
Authors: Zhu Ling Yan
which are suitable for load-bearing walls and non-load-bearing walls of general industrial and civil buildings; coal gangue sintered hollow brick is a type of sintered hollow brick, which is a new-type wall material made by crushing, aging, mixing, forming, drying and calcination processes using coal gangue — the byproduct of coal industry — as the raw material, it is categorized into two major types: load-bearing hollow brick and non-load-bearing hollow brick, the main feature of coal gangue hollow brick is "brickmaking without clay, brick firing without coal", which is a new-type wall material truly achieving energy reduction, soil conservation and refuse reclamation, the product can be used instead of clay bricks in coal regions; fly ash brick is a type of block material which is made by aging, wheel grinding, compression molding and ordinary or high pressure curing processes using fly ash and lime as the main raw materials, which are mixed with appropriate amount of gypsum, cinder and water
Lightweight partition boards generally have the excellent properties of lightweight, high strength, shock resistance, crack resistance, water resistance, fire resistance and sound insulation, and are of great significance to the increase of usable area of building, improvement of construction speed, reduction of labor intensity, reduction of quantity of wet construction, enhancement of degree of civilization of construction, reduction of overall cost of construction and other aspects.
In addition, we can explain that this structural system is feasible in northern Shan'xi 's small towns from the following aspects: first, sufficient raw materials, China's steel production is sufficient to support the development of steel structure housing, furthermore, wall materials and floor slabs are produced locally; second, national policy support, in recent years, national policy supports vigorous promotion of steel structure residential houses, promoting the industrialization of low-rise steel structure housing; third, some accumulated construction experience, low-rise steel structure housing has been constructed quite a few in China, and some design and production experience have been accumulated, moreover, the strength of the industry's professional scientific and technical personnel is growing; fourth, green building, the low-rise steel structure housing is in line with the concept of sustainable development, which is the mainstream of social development currently, the housing
Lightweight partition boards generally have the excellent properties of lightweight, high strength, shock resistance, crack resistance, water resistance, fire resistance and sound insulation, and are of great significance to the increase of usable area of building, improvement of construction speed, reduction of labor intensity, reduction of quantity of wet construction, enhancement of degree of civilization of construction, reduction of overall cost of construction and other aspects.
In addition, we can explain that this structural system is feasible in northern Shan'xi 's small towns from the following aspects: first, sufficient raw materials, China's steel production is sufficient to support the development of steel structure housing, furthermore, wall materials and floor slabs are produced locally; second, national policy support, in recent years, national policy supports vigorous promotion of steel structure residential houses, promoting the industrialization of low-rise steel structure housing; third, some accumulated construction experience, low-rise steel structure housing has been constructed quite a few in China, and some design and production experience have been accumulated, moreover, the strength of the industry's professional scientific and technical personnel is growing; fourth, green building, the low-rise steel structure housing is in line with the concept of sustainable development, which is the mainstream of social development currently, the housing
Online since: June 2012
Authors: Jian Wen Wei, Song Sheng Zhao
This type of adsorbents is also difficult to meet the practical requirements in flue gas due to its physical process, as well as its stronger polarity and strong water absorption capacity that costs high regeneration energy and competion with CO2 adsorption.
Coated mesoporous silicas are studied to adsorb CO2 relatively less mainly because it is difficult to control the autopolymerize reaction between the amino groups and water.
L., Richard N., Gas Purification, Gulf Professional Publishing, Houston, 1997
Coated mesoporous silicas are studied to adsorb CO2 relatively less mainly because it is difficult to control the autopolymerize reaction between the amino groups and water.
L., Richard N., Gas Purification, Gulf Professional Publishing, Houston, 1997
Online since: January 2012
Authors: Hai Jun Lou, Yi Bin Wang
Bank business: the relevant regulations concerning the credit standing of banks, commissions, letters of credit and letters of guarantee.
3 Implementation Risk
3.1 Design Risk [8,9]
J1 Design responsibility: The contractor shall be liable for certain errors or mistakes probably existing in “clients’ requirements”[10];
J2 Technical Standards: China’s design specifications and standards are inferior to the international ones coupled with the variegated technical standards;
J3 Adoption of new technologies: Application risks brought about by the new technologies;
K1 Quality of the design documents: The selection of technical solutions, the quality of the geological survey reports and omissions, faults, errors and contradictions existing in the design documents and the timeliness of the design changes, etc;
K2 Examination of design documents: the clients’ repeated examination of the design documents of the same version;
K3 The coordination and cooperation among all professional
teams: the immature conditions for salary raise are likely to lead to the amendment of the professional design. 3.2Purchase Risk (1)Provisions and supervisory risks in the clients‘purchase as stipulated in the contract L1 Goods Purchase: Clients will define the scope of the suppliers and the protective policies; equipment import and export restrictions; L2 Purchase Control: Delayed examination and approval of the clients and the improper full-range monitoring, inspection and acceptance
(2) Risk in construction management P1 Supporting Conditions for infrastructure: whether water, electricity, transportation, place, telecommunication, etc., are complied with the construction requirements; P2 Sub-contractor Management: The selection of sub-contractors, interface division, on-site management and coordination efforts and capacity, etc; P3 Personnel Management: the work efficiency, management condition and psychological counseling, etc; P4 Construction Materials: the problems related to the goods, quality, prices and time, etc; P5 Machinery and Equipment: Problems related to the Supply, maintenance condition and capacity of the construction equipment and accessories or components; P6 On-site Operational Environment: HSE (Health, Safety, Environment) requirements and penalty [13]; P7 Contract Management: the contract management awareness is rather poor and the claim for compensation and counter claim is not properly arranged.
teams: the immature conditions for salary raise are likely to lead to the amendment of the professional design. 3.2Purchase Risk (1)Provisions and supervisory risks in the clients‘purchase as stipulated in the contract L1 Goods Purchase: Clients will define the scope of the suppliers and the protective policies; equipment import and export restrictions; L2 Purchase Control: Delayed examination and approval of the clients and the improper full-range monitoring, inspection and acceptance
(2) Risk in construction management P1 Supporting Conditions for infrastructure: whether water, electricity, transportation, place, telecommunication, etc., are complied with the construction requirements; P2 Sub-contractor Management: The selection of sub-contractors, interface division, on-site management and coordination efforts and capacity, etc; P3 Personnel Management: the work efficiency, management condition and psychological counseling, etc; P4 Construction Materials: the problems related to the goods, quality, prices and time, etc; P5 Machinery and Equipment: Problems related to the Supply, maintenance condition and capacity of the construction equipment and accessories or components; P6 On-site Operational Environment: HSE (Health, Safety, Environment) requirements and penalty [13]; P7 Contract Management: the contract management awareness is rather poor and the claim for compensation and counter claim is not properly arranged.
Online since: October 2015
Authors: S. Nallusamy, P. Ambedkar
Jorn-Henrik et al [15] states that lack of professionals in production area, leads to irregular monitoring of work schedule and line area.
This risk includes socio-technical accidents such as equipment malfunctions, machine breakdowns, disruptions in the supply of electricity or water, IT failures or breakdowns, in addition to local human centered issues.
This risk includes socio-technical accidents such as equipment malfunctions, machine breakdowns, disruptions in the supply of electricity or water, IT failures or breakdowns, in addition to local human centered issues.
Online since: March 2019
Authors: Muhammad Ridzuan Zahid, Azzah Nazihah binti Che Abdul Rahim, Effah Yahya, Nik Raikhan Nik Him, Putri Faizura Megat Khamaruddin, Nur Hidayati Othman
About 10g of soil sample was diluted with distilled water in a sterile tube.
The soil suspension water is then poured and spread on the cetrimide agar plates.
Water was added into the microcosm to maintain its moisture content at 60%.
Environmental Protection Agency, Office of Water, Washington, DC.
El-Gendy, Introduction to petroleum biotechnology, Gulf Professional Publishing, Egypt, 2017
The soil suspension water is then poured and spread on the cetrimide agar plates.
Water was added into the microcosm to maintain its moisture content at 60%.
Environmental Protection Agency, Office of Water, Washington, DC.
El-Gendy, Introduction to petroleum biotechnology, Gulf Professional Publishing, Egypt, 2017