Sort by:
Publication Type:
Open access:
Publication Date:
Periodicals:
Search results
Online since: October 2013
Authors: Róbert Čep, Jan Valíček, Marta Harničárová, Adam Janásek, Jana Petrů, Marek Sadilek, Petr Mohyla, Andrej Czán
Hot work tool steel, with good ductility, good thermal conductivity, crack resistant in high temperatures, resistant to cooling down with water, high hardenability and resistance to tempering during work, good steel polishability.
Acknowledgement Article has been done in connection with project Increasing of Professional Skills by Practical Acquirements and Knowledge, reg.
Acknowledgement Article has been done in connection with project Increasing of Professional Skills by Practical Acquirements and Knowledge, reg.
Online since: January 2022
Authors: Norazharuddin Shah Abdullah, Zamri Ain Natasya
Description
Sample
A1
A2
A3
B1
B2
B3
Weight of empty container, W1 (g)
191.42
189.77
190.98
154.31
151.12
158.09
Weight of container + Weight of sample before drying, W2 (g)
240.11
240.25
241.35
204.21
201.75
208.53
Weight of container + Weight of sample after drying, W3 (g)
240.07
240.20
241.28
204.17
201.70
208.49
Water content (%)
0.08
0.10
0.14
0.08
0.10
0.08
Average (%)
0.11
0.09
Both samples showed relatively very low moisture content.
Geological Survey Professional Paper 1802, p.
Geological Survey Professional Paper 1802, p.
Online since: September 2011
Authors: Chang Dan Wang, Hui Su, Chun Hua Zou
The most prominent feature of collapsible loess is the additional settlement is rapid and larger by water and self weight of soil or additional stress.
Geotechnical Centrifuge Technology [M].Blackie Academic & Professional(1995)
Geotechnical Centrifuge Technology [M].Blackie Academic & Professional(1995)
Online since: June 2014
Authors: Esma Senel, Merete Hallenstvet
Except for the Cu-variation samples which were water-quenched, extruded profiles were air-cooled.
Barba, Alusurface 94: A seminar for Professional Up-dating in Surface Finishing of Aluminium, Interall Publications, Amsterdam, Holland, 1994
Barba, Alusurface 94: A seminar for Professional Up-dating in Surface Finishing of Aluminium, Interall Publications, Amsterdam, Holland, 1994
Online since: December 2012
Authors: Li Qun Guo, Yu Guo Cheng
During the excavation of a HOPSCA project group foundation pits in Fujian province, a large pit was excavated by dewatering well group earlier,it caused the water table dropped seriourly in the surrounding blocks and the follow-up foundation pits were excavated with only little dewatering measures. the large range of dewatering in the group foundation pits resulted in the differential settlement of road and cracking of some buildings aroud the group foundation pits.
But the national Codes, local Codes and professional norms in China almost did not make any provisions for group excavation engineering.
But the national Codes, local Codes and professional norms in China almost did not make any provisions for group excavation engineering.
Online since: September 2013
Authors: Yue Kun Zhang, Tie Xin Cheng, Wen Bin Du
It was the first stage for project management information system, and the future vision of system was mainly designed by the metaphor practice of agile system in order to individual modules and appearance became visible, meanwhile, developers and clients can be from different sides to understand the customer field and professional knowledge.
System development example Specific function module of the general model should be chosen according to the characteristics of the project when the agile development model based on bidirectional iteration will be applied and the case that the project management system development for the first phase of the South-to-North Water Diversion Project in Tianjin BinHai New Area, named Caozhuang pumping station project is illustrated in the paper.
System development example Specific function module of the general model should be chosen according to the characteristics of the project when the agile development model based on bidirectional iteration will be applied and the case that the project management system development for the first phase of the South-to-North Water Diversion Project in Tianjin BinHai New Area, named Caozhuang pumping station project is illustrated in the paper.
Online since: May 2015
Authors: Jim Jui Min Lin, Yu Yen Cheng, Mei Fang Lu
This study will aim at stationary pollution sources such as coal-fired boiler in electricity and cogeneration profession, secondary aluminum refinery and cement kiln to construct its professional dioxin emission factors to provide future reference for processing control strategies formulation.
As fire coal is burned in furnace to release energy to heat water or other organic heat carrier such as heat transfer oil et al. to a certain degree or pressure, the boiler will function as a heat energy power device.
As fire coal is burned in furnace to release energy to heat water or other organic heat carrier such as heat transfer oil et al. to a certain degree or pressure, the boiler will function as a heat energy power device.
Online since: August 2013
Authors: Rui Zhang
At present, this paper discusses the project risk areas covering oil, Marine, electric power, water conservancy (dam), urban transportation, construction, national defense scientific research, international contracting, nuclear power, metallurgy, aviation, etc[2].
From the project characteristics, it is known that it is a kind of high risk project, the technology is complex, equipment professional, social environment, special laws and safety factors.
From the project characteristics, it is known that it is a kind of high risk project, the technology is complex, equipment professional, social environment, special laws and safety factors.
Online since: May 2011
Authors: Xiang Ping Kang, Ning Feng
The contractor is inactive to the insurance.
0.619
2
The owner/contractor regards the insurance as compulsive request of the government and the bank and has to fulfill it.
0.619
2
The owner/contractor is weak in risk and insurance.
0.611
3
During the process of compensation, the procedure is detailed and the responsibility shifts seriously.
0.597
4
Insurance company is short of professional hands (especially for engineering insurance).
0.589
5
Each part of the project considers the insurance will increase the cost.
0.586
6
The owner isn’t the propeller of the engineering insurance.
0.58
7
Information of the engineering insurance is seriously unsymmetrical because of the complication and professionalization of building engineering technique.
0.572
8
The engineering insurance codes developed is less, the difference of the cost rate level is little and the guarantee contents lack the selectivity.
0.543
9
The owner and contractor only buy insurance for the project with high risks or portion
For instance, four insurance companies such as Ping An Insurance, Pacific Ocean Insurance and the People’s Insurance Company etc paid off 5.6 billion dollars for the water trouble which took place in No.4 line of the Shanghai rail transit in July, 2003 [18].
For instance, four insurance companies such as Ping An Insurance, Pacific Ocean Insurance and the People’s Insurance Company etc paid off 5.6 billion dollars for the water trouble which took place in No.4 line of the Shanghai rail transit in July, 2003 [18].