Authors: Chen Mi, Xin Hong Zhao, Da Ming Han
The construction of the snow road needs a professional pressure to press snow, six centimeters thickness is necessary in general, to ensure the smooth, and uniform of thickness, professional process is needed.
The methods of making round ice road and the straight ice road are following: pushing the ice snow with scraper, and then pouring water at least five times.
And in every time before the pouring grind with professional grinding tools, until the ice is flat to test meeting the demand of the friction coefficient.
The methods of making round ice road and the straight ice road are following: pushing the ice snow with scraper, and then pouring water at least five times.
And in every time before the pouring grind with professional grinding tools, until the ice is flat to test meeting the demand of the friction coefficient.
Online since: January 2012
Authors: De An Zhao, Bo Chen, Yan Qian Wang
The system can play full advantages of the Internet to promote water cutter timely, correct diagnosis, and improve equipment utilization.
Remote Fault Diagnosis System Project for Water Cutter based on GPRS Total Structure of System.
For example,when the cooling water temperature is too high, , on-site terminal will send detected fault information to the data center, and the data center will receive the contents of the fault, and then diagnosis is obtained to show that the laminated partly is blocked, the water level is low, and the thermostat is damaged, as shown in Figure 4.
After several experiments, the system can accurately diagnose the results, such as when the laminated part is blocked, the cooling water level is diagnosed as low; when cooling water pressure is too low, then the diagnosis is interruption of cooling water; as for thermostat damage, the diagnosis is that there is gas in cooling water.
Conclusions This article designs a system of remote fault diagnosis based on GPRS technology, which has advantages such as having a wide range of monitoring, data transmission is not limited by the geographical and climatic constraints, data processing and fault warning is in a timely manner .Effective operation of the system not only allows water cutter manufacturer to provide professional fault resolution to clients timely, but also optimize the product and improve the quality of the water cutter according to the fault statistics, thereby it can enhance the competitiveness of enterprises to promote business.
Remote Fault Diagnosis System Project for Water Cutter based on GPRS Total Structure of System.
For example,when the cooling water temperature is too high, , on-site terminal will send detected fault information to the data center, and the data center will receive the contents of the fault, and then diagnosis is obtained to show that the laminated partly is blocked, the water level is low, and the thermostat is damaged, as shown in Figure 4.
After several experiments, the system can accurately diagnose the results, such as when the laminated part is blocked, the cooling water level is diagnosed as low; when cooling water pressure is too low, then the diagnosis is interruption of cooling water; as for thermostat damage, the diagnosis is that there is gas in cooling water.
Conclusions This article designs a system of remote fault diagnosis based on GPRS technology, which has advantages such as having a wide range of monitoring, data transmission is not limited by the geographical and climatic constraints, data processing and fault warning is in a timely manner .Effective operation of the system not only allows water cutter manufacturer to provide professional fault resolution to clients timely, but also optimize the product and improve the quality of the water cutter according to the fault statistics, thereby it can enhance the competitiveness of enterprises to promote business.
Online since: June 2014
Authors: Angela Viglianisi
As regards the instruction and professional formation, the city offers a great variety of curricula.
There are: - 6 Colleges: 2 Classical, 2 Scientifical,1 Artistic, 1 Linguistic; - 1 Technical Institute for Surveyors; - 2 ex - institute and Magistral school; - 2 Professional Institutes Industry and Handcraft; - 1 Artistic Institute; - 6 Commercial and Technical Institute; - 2 Industrial and Technical Institutes; - 1 Technical Institute for Social activities; - 1 Academy of Music; - 1 Academy of Arts; - 1 Professional Institute for Commercial and Touristic Services.
Fig. 1 - 3 areas OTA The Optimum Territorial Area (OTA) is the geographical area where, according to the Galli Law 36/1994, Art. 8, the Integrated Water Service is organized in the forms and ways established by Law 142/90.
The Integrated Water Service consists of all public services of catchment zones, water treatment, feeder services and distribution of water for civil use, gathering system and purification service of waste water, to be organized through OTAs.
With the Law 10/97, the Calabria Region regulated the forms and ways of cooperation between the Local Bodies to organize the Integrated Water Service.
There are: - 6 Colleges: 2 Classical, 2 Scientifical,1 Artistic, 1 Linguistic; - 1 Technical Institute for Surveyors; - 2 ex - institute and Magistral school; - 2 Professional Institutes Industry and Handcraft; - 1 Artistic Institute; - 6 Commercial and Technical Institute; - 2 Industrial and Technical Institutes; - 1 Technical Institute for Social activities; - 1 Academy of Music; - 1 Academy of Arts; - 1 Professional Institute for Commercial and Touristic Services.
Fig. 1 - 3 areas OTA The Optimum Territorial Area (OTA) is the geographical area where, according to the Galli Law 36/1994, Art. 8, the Integrated Water Service is organized in the forms and ways established by Law 142/90.
The Integrated Water Service consists of all public services of catchment zones, water treatment, feeder services and distribution of water for civil use, gathering system and purification service of waste water, to be organized through OTAs.
With the Law 10/97, the Calabria Region regulated the forms and ways of cooperation between the Local Bodies to organize the Integrated Water Service.
Online since: December 2014
Authors: Da Dong He, Cheng Wei, Da Wei Xiao, Juan Fu, Jing Li
During the whole design process, the Computer Simulation Environment technology is combined with the regular design methods, cooperating with multi professional fields such as planning, architecture, landscape and pyrology.
After building energy consumption calculation, the goal of energy conservation and environmental protection is achieved. 1 Introduction 1.1 Passive Planning and Design of Green Campus Green campus, which maximizes resource conservation (land, water, materials and energy etc.) and environmental protection in the whole life cycle of the area, provides a favorable environment as well as human harmony with nature for teachers and students.
All of the wasted water, after certain treatment, is collected into the drainage system for further processing.
The folding aerator oxygen facility is used as a treatment for water recycling.
Recycled water is available for non-contact water usage such as: toilette water, irrigation, spraying, road cleaning and water landscape supplying.
After building energy consumption calculation, the goal of energy conservation and environmental protection is achieved. 1 Introduction 1.1 Passive Planning and Design of Green Campus Green campus, which maximizes resource conservation (land, water, materials and energy etc.) and environmental protection in the whole life cycle of the area, provides a favorable environment as well as human harmony with nature for teachers and students.
All of the wasted water, after certain treatment, is collected into the drainage system for further processing.
The folding aerator oxygen facility is used as a treatment for water recycling.
Recycled water is available for non-contact water usage such as: toilette water, irrigation, spraying, road cleaning and water landscape supplying.
Online since: May 2014
Authors: Yu Lun Chien, Yi Ting Hunag, Chih Hong Huang
The energy status within canopy was analyzed by Gird TIN Default from Map info Professional software.
The atmosphere consists of dry air, water vapor and aerosol particles.
The control group was set up in a nearby vacant land, paved with water permeable bricks.
The figures were organized before entered into MapInfo Professional and further analyzed energy status within canopy by Gird TIN Default.
Zeghmati, Turbulent mixed convection of heat and water vapor transfers in a two-dimensional vegetation canopy.
The atmosphere consists of dry air, water vapor and aerosol particles.
The control group was set up in a nearby vacant land, paved with water permeable bricks.
The figures were organized before entered into MapInfo Professional and further analyzed energy status within canopy by Gird TIN Default.
Zeghmati, Turbulent mixed convection of heat and water vapor transfers in a two-dimensional vegetation canopy.
Online since: December 2012
Authors: Nan Xie
Three Dimensional Visualization Technologies for Water Conservancy Works
Nan Xie
Computer and Information Engineering Department,
Zhejiang Water Conservancy and Hydropower College, Hangzhou, P.R.China
nkxiexie@163.com
Keywords: digital model; 3D visual simulation technologies; water conservancy works.
A true 3D visual simulation system prototype for large-scale water conservancy project was built.
Introduce Most of the construction of water conservancy is relatively large and complex.
With the corresponding theoretical basis of the ongoing research and in-depth foreign three-dimensional geological modeling software has formed a considerable scale, the typical professional software.
Conclusion Water conservancy projects are often built between the mountains and canyons.
A true 3D visual simulation system prototype for large-scale water conservancy project was built.
Introduce Most of the construction of water conservancy is relatively large and complex.
With the corresponding theoretical basis of the ongoing research and in-depth foreign three-dimensional geological modeling software has formed a considerable scale, the typical professional software.
Conclusion Water conservancy projects are often built between the mountains and canyons.
Online since: November 2012
Authors: Chun Jiao Lin, Xiao Yao, Chong Xiong He
The construction of the pilot tunnel is fast, and the professional engineers should work timely and identify the gathered data, and feedback to the construction site.
The landslides, water-gushing and mud-gushing would possibly be encountered in the tunnel construction.
The first was a prediction of fissure water.
According the previous exploration experience, we could judge that there was developed fissure water, but could not determine that whether the fissure water was artesian or not.
Then the fissure water was judged as low-pressure water, and the water had already been emptied before excavating to this position.
The landslides, water-gushing and mud-gushing would possibly be encountered in the tunnel construction.
The first was a prediction of fissure water.
According the previous exploration experience, we could judge that there was developed fissure water, but could not determine that whether the fissure water was artesian or not.
Then the fissure water was judged as low-pressure water, and the water had already been emptied before excavating to this position.
Online since: October 2011
Authors: Fei Fei Yu, Yun An Yang, Hui Li, Fei Xiang
As the most influential professional groups in international landscape design, ASLA said: meeting the needs of human is based on the healthy landscape.
Effective utilization of water resources and protection.
It shows in the following respects: the use of water, rainwater collection system planning and design, water purification through wetlands system, the use of water-saving irrigation system, division grade of water resource to different use in the environment.
So it meet the urban landscape ornamental water and save and protect water resource at the same time.
During the water landscape design, we should pay attention to design water shape and size according to the base situation, elegant water cycle and system to reduce the maintenance cost later
Effective utilization of water resources and protection.
It shows in the following respects: the use of water, rainwater collection system planning and design, water purification through wetlands system, the use of water-saving irrigation system, division grade of water resource to different use in the environment.
So it meet the urban landscape ornamental water and save and protect water resource at the same time.
During the water landscape design, we should pay attention to design water shape and size according to the base situation, elegant water cycle and system to reduce the maintenance cost later
Online since: June 2019
Authors: Martin Alexa, Barbara Kucharczyková, Petr Misák, Romana Halamová, Dalibor Kocáb
Within the experiment, two types of cementitious composites were mixed - cement paste and cement mortar, both having the same water/cement ratio.
This fact has begun to be taken into account by professionals and domestic as well as foreign laboratories have started to investigate the effects of individual components in the composition of concrete on the value of its modulus of elasticity, as can be seen in many publications, see for example [3,4].
Experiment To measure the modulus of elasticity in the early stage of ageing of the cement-based material, cement paste and cement mortar were produced, both having the water/cement ratio of 0.4.
Their production used CEM I 52.5 R cement and potable water.
This value was derived from an assumption that after mixing, a cementitious material behaves similarly to a liquid and the Poisson’s ratio is then near to the value of 0.5 [9], as is used for water.
This fact has begun to be taken into account by professionals and domestic as well as foreign laboratories have started to investigate the effects of individual components in the composition of concrete on the value of its modulus of elasticity, as can be seen in many publications, see for example [3,4].
Experiment To measure the modulus of elasticity in the early stage of ageing of the cement-based material, cement paste and cement mortar were produced, both having the water/cement ratio of 0.4.
Their production used CEM I 52.5 R cement and potable water.
This value was derived from an assumption that after mixing, a cementitious material behaves similarly to a liquid and the Poisson’s ratio is then near to the value of 0.5 [9], as is used for water.
Online since: July 2014
Authors: Man Zhang, Wei Xiong
It can pull the construction of Nanchang city from the establishing of Yinyan logistics base to build a domestic and international logistics hub nodes with a system constitute of road, water and air transport while making the road system as the main transportation means.
The corporation vision of Yinyan logistics base is: Jiangxi Yinyan Company Limited will accelerate the construction of logistics infrastructure and high-tech logistics technology and equipment, improve the base supporting aspects, introduce professional management personnel, and establish a logistics system relatively synchronized with advanced international logistics industry to provide a platform and a logistics base with high quality services for enterprises.
For example, what kind of information management system to be introduced or what kind of information should be collected and how man new professionals on information management should be employed, and son on, all these questions related to the real effectiveness of the new introduced information technology system.
With rapid economic and technical development in this era[8], a professional of a filed is playing a more and more important role on the development of the economy and society.
The corporation vision of Yinyan logistics base is: Jiangxi Yinyan Company Limited will accelerate the construction of logistics infrastructure and high-tech logistics technology and equipment, improve the base supporting aspects, introduce professional management personnel, and establish a logistics system relatively synchronized with advanced international logistics industry to provide a platform and a logistics base with high quality services for enterprises.
For example, what kind of information management system to be introduced or what kind of information should be collected and how man new professionals on information management should be employed, and son on, all these questions related to the real effectiveness of the new introduced information technology system.
With rapid economic and technical development in this era[8], a professional of a filed is playing a more and more important role on the development of the economy and society.