Engineering Research
Advanced Engineering Forum
Applied Mechanics and Materials
Engineering Chemistry
Engineering Innovations
Journal of Biomimetics, Biomaterials and Biomedical Engineering
International Journal of Engineering Research in Africa
Materials Science
Advanced Materials Research
Defect and Diffusion Forum
Diffusion Foundations and Materials Applications
Journal of Metastable and Nanocrystalline Materials
Journal of Nano Research
Key Engineering Materials
Materials Science Forum
Nano Hybrids and Composites
Solid State Phenomena
Engineering Series
Advances in Science and Technology
Construction Technologies and Architecture
Engineering Headway
Books by Keyword: Earned-Value Analysis
Books
Edited by:
Dr. Nicuşor-Alin Sîrbu, Prof. Jong Hak Kim, Prof. Alan Lau and Prof. Steven Y. Liang
Online since: June 2022
Description: This volume of "Engineering Innovations" presents research results on materials properties and their processing technologies, reliability of technological equipment and machines, and technologies of unit reconditioning. Readers can also look at the results of designing of abrasive removal system in the abrasive water jet cutting machine. In the volume are also presented results of an experimental study on truss-column pinned connections in large-span steel structures, and an assessment of the applicability of earned-value analysis methods in the construction projects. The presented volume of "Engineering Innovations" will be helpful to many specialists from the machinery and construction sectors.
Showing 1 to 1 of 1 Books